background image

OWNER'S MANUAL

Power Tower

CS-PT

Summary of Contents for Power Tower CS-PT

Page 1: ...OWNER S MANUAL Power Tower CS PT...

Page 2: ...l before using this equipment CAUTION Important Safety Instructions 3 Instructions 4 Parts List 5 Exploded View 6 Measurement Guide 7 Assembly Instructions 8 Assembly 9 Maintenance Schedule 14 General...

Page 3: ...it has been dropped or damaged Never drop or insert anything into any opening in the equipment Always check the unit and its cables before each use Make sure that all fasteners and cables are secure...

Page 4: ...nal injury The equipment is designed to provide the smoothest most effective exercise motion possible After assembly you should check all functions to ensure correct operation If you experience proble...

Page 5: ...Small Plate 2 12 Big Plate 2 13 Back Pad 1 14 Plug 32 4 15 Handle Grip 38 32 550 2 16 Grip 32 175 6 17 Plug 50 8 76 2 2 19 Flat Washer 11 23 2 42 20 Bolt Cap 2 21 Big Washer 11 30 2 4 22 Button Head C...

Page 6: ...6 Exploded View...

Page 7: ...7 BHCS Button Head Cap Screw SHCS Socket Head Cap Screw FHCS Flat Head Cap Screw HHB Hex Head Bolt Measurement Guide...

Page 8: ...y be large heavy or awkward to handle alone It is important that you assemble your product in a clean clear uncluttered area This will enable you to move around the product while you are fitting compo...

Page 9: ...t Upright Frame 1 to Base Frame 8 using one M10 75 BHCS 22 two 11 23 2 Flat Washer 19 one M10 Nylon Lock nut 25 Repeat Step 1 for other side of IFPT Note Hand tighten bolts and Nylon Lock nuts until m...

Page 10: ...ur M10 80 BHCS 23 eight 11 23 2 Flat Washer 19 four M10 Nylon Lock nut 25 3 Connect Left and Right Angle Supports 2 3 to Upright Frame 1 using two M10 75 BHCS 22 four 11 23 2 Flat Washer 19 two M10 Ny...

Page 11: ...11 Assembly Step 2...

Page 12: ...ct Elbow Pad Support Frame 4 to Upright Frame 1 using four M10 100 BHCS 24 four 11 23 2 Flat Washer 19 four Big Washer 21 four M10 Nylon Lock nut 25 Note Hand tighten bolts and Nylon Lock nuts until m...

Page 13: ...13 to Back Pad Support Frame 5 using two M10 72 BHCS 27 two 11 23 2 Flat Washer 19 2 Connect Elbow Pads 10 to Elbow Pad Support Frames 4 using four M10 72 BHCS 27 four 11 23 2 Flat Washer 19 Note Wre...

Page 14: ...r tension DAILY WEEKLY Inspect Accessory Bars and Handles WEEKLY 3 MONTHS Inspect All Decals WEEKLY 3 MONTHS Inspect All Nuts and Bolts Tighten if needed WEEKLY 3 MONTHS Inspect Anti Skid Surface WEEK...

Page 15: ...oting and need to be replaced if they appear worn or become slippery Belts and Cables We uses only high quality belt and mil spec cables Visually inspect the belts and cables for fraying cracking peel...

Page 16: ...ediately First determine a set of realistic goals and objectives for yourself By deciding on an exercise plan that is right for you prior to starting you will contribute significantly to your success...

Page 17: ......

Reviews: