Questions?
(888) 788-2254
www.CaliBamboo.com
GeoWood
®
Flooring Installation Guide
Floating Click-Lock GeoWood Plank Installation (Pages 3-8)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at
www.CaliBamboo.com
Pre-Installation
P A C E
EXPANSION
GAPS
GeoWood flooring can be used in areas ranging from
50°F to 100°F. The ideal indoor humidity range for
GeoWood is 35-65% relative humidity.
Leave at least 3/8” expansion spaces between flooring and
ALL vertical objects (walls, cabinets, pipes, etc.) Large flooring
runs may require additional expansion space. Flooring runs
over 40 feet require additional expansion space or
transitional pieces. Undercut door jambs and casings to
provide adequate expansion space. Do not screw or nail
cabinetry or other permanent fixtures to a floating floor.
50-100°
F
3/8” Expansion Gap
3/8” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the subfloor is flat, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the subfloor moisture prior to installation and apply
an appropriate moisture barrier such as 6mil Plastic on
concrete subfloors.
Use 6mil Plastic on Concrete
PA C E
ACCLIMATE
FLOORING
For GeoWood flooring, lay boxes flat on the floor and only
open box ends as shown above.
Acclimate your floor as
close to the installation area as possible, for 24 hours in
normal living conditions.
Acclimate Your GeoWood Flooring for 24 hrs
P
A C E
PREPARE
THE SUBFLOOR
35-65%
rH
Page 4