background image

37

Sequence of Operation

Priority Jumper: ON (Zone #1 becomes priority)

Master/Slave Jumper: Master

Status During Priority: ON

• 

A demand occurs from a T-stat (T-stat closes 

TT terminals) in zones 2 thru 6. The “T-STAT 

CALL” LED illuminates for that zone.

• 

ZVR control sends 24 VAC to the corresponding 

zone MOTOR terminals to open the zone 

valve.

• 

When the end switch on the zone valve closes, 

the control sends 120 VAC to SEC PUMP and 

SYSTEM  PUMP.  The  “VALVE  OPEN”  LED 

illuminates for that zone and the XX contacts 

close to signal a heat demand to the boiler.

• 

When the demand from the T-stat is satisfied 

(T-stat opens TT terminals), both the “T-STAT 

CALL” and “VALVE OPEN” LED’s turn off.

• 

24 VAC is dropped from the corresponding 

zone MOTOR terminals.

• 

If no other zones are calling, power is dropped 

to the SEC PUMP and SYSTEM PUMP and 

the XX contacts are opened.

• 

If a demand occurs from the DHW aquastat 

(zone #1), The “T-STAT CALL” LED illuminates 

for  Zone  #1  and  the  “VALVE  OPEN”  LED 

will illuminate. (When using a DHW pump, 

a jumper must be installed on Zone #1 end 

switch terminals.)

• 

If any other zone was calling (Zones 2 thru 

6) when Zone #1 called, power (24 VAC) is 

dropped to those zones.

• 

The XX and DHW contacts close.

• 

The PRIORITY PUMP and SYSTEM PUMP 

contacts deliver 120 VAC

• 

The SEC PUMP is off.

• 

Once the Zone #1 DHW demand is satisfied, 

power to the PRIORITY PUMP and SYSTEM 

PUMP is dropped, the DHW contacts open.

• 

If a demand from zones 2 thru 6 is present, 

24 VAC is delivered to the corresponding 

zone  valve(s)  and  the  “T-STAT  CALL”  LED’s 

illuminate. 

• 

When the zone valve end switch closes, 

the  “VALVE  OPEN”  LED  illuminates,  the  XX 

contacts close, the SEC PUMP and SYSTEM 

PUMP terminals deliver 120 VAC.

DHW Time Out \ Freeze Prevention Feature

• 

After one hour of a priority demand, the control 

will open the DHW contacts and turn off power 

to the DHW pump and Zone Valve #1. 

• 

If a heating demand is present from Zones 

#2- 6, the control will satisfy those demands 

before going back to the DHW call.

• 

After the heating demands are met, the control 

will go back to DHW and re-set the one hour 

timer.

Description of terminals

 

= Ground

= Neutral (common leg of 120 VAC)

= Line (live leg of 120 VAC)

Thermostat terminals

R         = 24 VAC
W        = Heat call
C        = Common of 24 VAC

Boiler terminals

XX = Dry contacts rated up to 120 VAC, 2 Amps.  

Closes when any zone calls including priority. 

Typically connected to TT on boiler control.
DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 

2 Amps.  Closes only when priority is enabled and 

calling. Typically used to close ZR\ZC (120 VAC) 

or DHW contacts (24 VAC) on boiler controls 

equipped with these features.

Pump terminals

SYSTEM PUMP = Runs when any zone calls for 

heat. When priority is enabled, the status of the 

pump (on\off) during a priority call is selected via 

a jumper
SEC PUMP = Runs when any zone calls for heat 

except the priority zone when it is enabled.
PRIORITY PUMP = Runs when the priority zone 

calls. A jumper is required between the END 

SWITCH terminals when using a pump.

Valve terminals

Motor = 24 VAC to power the zone valve motor
End Switch = Connects to end switch on zone 

valve.  Must be jumpered if using a 2 –wire zone 

valve. 

WARNING: 

NEVER CONNECT R & C DIRECTLY, 

this will be a direct short on the 24 VAC supply

Summary of Contents for Z-one ZSR10 Series

Page 1: ...ercise Dry contacts for DHW ZR ZC capable of switching line voltage High capacity transformer Large terminal connections Simplified wiring with extra ground terminals Heavy duty sealed relays Fuse pro...

Page 2: ...nnections are in accordance with the electrical wiring diagram and in accordance with national and local electrical codes WARNING Avoid electrical noise interference Do not install near large conducto...

Page 3: ...ON the primary pump will continue to operate during priority Exercise OFF Exercise ON When exercise mode is ON each circulator is switched on for 30 seconds following 72 hours of inactivity Post Purge...

Page 4: ...duct with functional one Mounting Mount the Caleffi Z one switching relay box to a suitable surface Slotted holes are provided for mounting purposes Do not mount to a surface that exceeds 115 F 45 C T...

Page 5: ...r removal Hold either the left or the right end of the box up and at an angle Use body for stabilizing relay box Insert screwdriver and push tabs inward cover should release from base Roll cover off b...

Page 6: ...N L PUMP 5 N L PUMP 6 N THM 5 C R W T T COM THM 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise O...

Page 7: ...5 C R W T T COM THM 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge...

Page 8: ...6 Zone Z6P THM 2 C R W T T COM COMMS D P DHW ZR ZC X X THM 3 C R W T T COM THM 1 C R W T T COM L PUMP 2 N PRIMARY PUMP L PRIORITY PUMP 1 N L POWER IN N GROUNDS L PUMP 3 N TRANSFORMER 12 20VA L N THM...

Page 9: ...along with a primary pump can be operated Zone priority is selectable with 1 hour time out feature Other features include pump exercising selectable post purge and 3 pump ground terminals for simpli...

Page 10: ...20 ZVR103 ZVR104 ZVR106 multi zone valve control Product overview 22 Circuit board 23 Cover removal Transformer Installation 24 Product details 25 C1 Mod Con boiler hydro separator zone valves 26 C2 M...

Page 11: ...UMP 5 N L PUMP 6 N THM 5 C R W T T COM THM 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Pos...

Page 12: ...0 VAC pump with boiler enable or two devices without boiler enable 5 A capacity each relay 10 A total Rear knock outs for mounting onto 4 x4 junction box High capacity 6VA transformer Simpli ed wiring...

Page 13: ...p connection Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats Replaceable fuses 6 VA Transformer Keyhole mounting which fits a 4X4 junction box Pre installed jumper Rear knockout f...

Page 14: ...om power zone transformer N L L RELAY 1 C N O N C C N O N C RELAY 2 Calef single zone relay L N A1 Single thermostat Hydronic diagram is for illustration purposes only some components have been remove...

Page 15: ...ied and opens RW TT The relay contacts return to their normal position common to normally closed The zone LED turns off Description of terminals Ground N Neutral Common leg of 120 VAC L Line live leg...

Page 16: ...N C C N O N C RELAY 2 Calef single zone relay 4 wire zone valve 4 wire zone valve 4 wire zone valve R W 24 VAC T T R W R W End switch wires L N A2 Multiple thermostats Hydronic diagram is for illustr...

Page 17: ...LED illuminates When the last of the T stats is satisfied the corresponding zone valves closes which opens the end switch contacts The relay contacts return to their normal position turning off power...

Page 18: ...V R W C T T com power zone transformer N L L RELAY 1 C N O N C C N O N C RELAY 2 Calef single zone relay T T L N A3 Single master thermostat panel radiators with TRVs variable speed pump Hydronic diag...

Page 19: ...side air reset curve As long as the master thermostat is calling the boiler will maintain the buffer tank to the target temperature The thermostatic radiator valves modulate the flow through the panel...

Page 20: ...ure Selectable post purge and exercise Dry contacts for DHW ZR ZC capable of switching line voltage High capacity transformer Large terminal connections Simplified wiring with extra ground terminals H...

Page 21: ...ions to expansion board Power ON LED Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats DHW ZR ZC closes only during priority call Rated for 120 VAC 2 amps Selectable DIP switches XX...

Page 22: ...release from base Roll cover off base Mounting Do not mount to a surface that exceeds 115 F 45 C The unit must be only located in dry interior locations Use only copper conductor supply wire suitable...

Page 23: ...M T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge ON ZSR106 Z...

Page 24: ...P 6 N T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge...

Page 25: ...ing priority Typically connected to TT on boiler control DHW ZR ZC Dry contacts rated up to 120 VAC 2 Amps Closes only when priority is enabled and calling Typically used to close ZR ZC 120 VAC or DHW...

Page 26: ...R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge ON DHW aquastat T T ZR...

Page 27: ...ll of the zone pumps DHW Time Out Freeze Prevention Feature After one hour of a priority demand the control will open the DHW contacts and turn off power to the DHW pump If a heating demand is present...

Page 28: ...N T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF...

Page 29: ...C 2 Amps Closes when any zone calls including priority Typically connected to TT on boiler control DHW ZR ZC Dry contacts rated up to 120 VAC 2 Amps Closes only when priority is enabled and calling Ty...

Page 30: ...contacts for DHW ZR ZC capable of switching line voltage Large terminal connections High capacity 40 VA transformer standard for 3 and 4 zone models expandable to 80 VA and 80 VA for the 6 zone model...

Page 31: ...wire communications to expansion board Power ON LED Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats DHW ZR ZC closes only during priority call Rated for 120 VAC 2 amps Master Sla...

Page 32: ...ttom latch Snap top of transformer into latch arms Feed wiring through hole near the top of the transformer and insert transformer plug into the socket Repeat process for 2nd transformer if using six...

Page 33: ...C R W T T COM D DHW ZR ZC X X T STAT 3 C R W T T COM T STAT 1 C R W T T COM T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM 6 Zone ZVR106 PWR TSAT1 ZONE1 TSAT2 ZONE2 TSAT3 ZONE3 T...

Page 34: ...RIORITY PUMP N L SEC PUMP N STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MO...

Page 35: ...0 VAC L Line live leg of 120 VAC Thermostat terminals R 24 VAC W Heat call C Common of 24 VAC Boiler terminals XX Dry contacts rated up to 120 VAC 2 Amps Closes when any zone calls including priority...

Page 36: ...Y ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N MASTER SLAVE L N PRIORITY pump SECONDARY pump ZV...

Page 37: ...AT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Preventio...

Page 38: ...RIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N MASTER SL...

Page 39: ...T STAT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Prev...

Page 40: ...2 C R W T T COM COMMS D P DHW ZR ZC X X T STAT 3 C R W T T COM T STAT 1 C R W T T COM L POWER IN N T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR TSAT1 ZONE1 TSAT2 ZONE2 TSA...

Page 41: ...acts deliver 120 VAC The SEC PUMP and SYSTEM PUMP are off Once the Zone 1 DHW demand is satisfied power to the PRIORITY PUMP is dropped the DHW contacts open If a demand from zones 2 thru 12 is presen...

Page 42: ...PUMP N L SEC PUMP N SYSTEM PUMP STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWIT...

Page 43: ...tral common leg of 120 VAC L Line live leg of 120 VAC Thermostat terminals R 24 VAC W Heat call C Common of 24 VAC Boiler terminals XX Dry contacts rated up to 120 VAC 2 Amps Closes when any zone call...

Page 44: ...SEC PUMP N SYSTEM PUMP STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR M...

Page 45: ...STAT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Prevent...

Page 46: ...X T STAT 3 C R W T T COM T STAT 1 C R W T T COM L POWER IN N T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR TSAT1 ZONE1 TSAT2 ZONE2 TSAT3 ZONE3 TSAT4 ZONE4 TSAT5 ZONE5 TSAT6...

Page 47: ...e MOTOR terminals If no other zones are calling power is turned off to the SEC PUMP and SYSTEM PUMP and the XX contacts are opened Description of terminals Ground N Neutral common leg of 120 VAC L Lin...

Page 48: ...40 Caleffi North America Inc 3883 W Milwaukee Rd Milwaukee WI 53208 Tel 414 238 2360 Fax 44 238 2366 www caleffi com usa sales caleffi com Copyright 2014 Caleffi North America Inc...

Reviews: