Installation
HydroLink™ units should be installed in
accordance with the diagrams shown in
this instruction manual, ensuring the correct
connection of the flow and return pipework
and the main and branch connections.
HydroLink™ units can also be installed upside
down, as long as the connection logic shown is
followed.
The 1/2" NPT female connections must only be
used for connecting an air vent valve and drain
valve, and not for connecting branch circuits.
The air vent and drain valve are included in
shipment but not connected to the Hydrolink™.
Use a liquid anaerobic thread sealant to ensure
water tight connections.
Installation and Insulation Assembly
Procedures –
Models 2+2
and 3+1
HydroLink™
models
2+2 and 3+1
are supplied
with angle wall-
mounting brackets, which allow the front-to-
back positioning to be adjusted.
After bracket mounting and leak-testing,
the pre-formed insulation shell should be
attached as described in points 1 and 2
below.
1.
Remove the protection film from
the surface adhesive and assemble.
2.
If the HydroLink™ unit is to be used with
chilled water, spread a thin layer of sealant
around the outer edges of the pre-formed
insulation, wait until the solvent has
evaporated (about 10 minutes) and then
assemble.
0,25
0,5
0,75
1,0
1,25
1,5
1,75
2,0
2,25
100
80
60
40
20
-20
-15
-10
-5
0
5
10
15
20
12
3
6
9
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
24
23
22
21
20
19
WATCH
CALEFFI
0,25
0,5
0,75
1,0
1,25
1,5
1,75
2,0
2,25
20
0,25
0,5
0,75
1,0
1,25
1,5
1,75
2,0
2,25
100
80
60
40
20
-20
-15
-10
-5
0
5
10
15
20
12
3
6
9
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
24
23
22
21
20
19
WATCH
CALEFFI
0,25
0,5
0,75
1,0
1,25
1,5
1,75
2,0
2,25
20
3