Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure the
safe, secure, and timely installation of your new spa. The following sections are guidelines on how to prepare for delivery
and set-up of your new spa. Specifically covered are site selection, delivery access, ground preparation, and electrical
requirements.

Remember to carefully read the Owner’s Manual that accompanies your spa and to complete the warranty card within ten
days of delivery. These items, along with other valuable information, included in the Owner’s Package which can be
located in the equipment compartment of your spa. You will also find your serial number, in the equipment compartment.

Watkins Manufacturing Corporation reserves the right to change features, specifications and design without notification
and without incurring any obligation.

DATE PURCHASED:  ________________________________________________________________________

DATE INSTALLED: __________________________________________________________________________

DEALER: ____________________________________________________________________________________

ADDRESS: __________________________________________________________________________________

TELEPHONE: ______________________________________________________________________________

In most cities and counties, permits will be required for the installation of electrical circuits or the construction of exterior
surfaces (decks and spa enclosures). In addition, some communities have adopted residential barrier codes which may
require fencing and/or self-closing gates on the property to prevent unsupervised access to a pool (or spa) by children
under 5 years of age. Your Caldera

®

spa is equipped with a locking cover that meets the ASTM F1346-91 Standard for

Safety Covers and as a result, is usually exempt from most barrier requirements. As a general practice, your local Building
Department will inform you of any applicable barrier requirements at the time a permit is obtained for the installation of
an electrical circuit. Your Caldera dealer can provide information on which permits may be required.

2007 Utopia / Aquatic Melodies

®

/ Paradise 

Pre-Delivery Instructions

Summary of Contents for Utopia

Page 1: ...___________________________________________________ DEALER ____________________________________________________________________________________ ADDRESS ________________________________________________...

Page 2: ...ATION Be aware of some special requirements if you place your spa indoors Water will accumulate around the spa so flooring materials must provide a good grip when wet Proper drainage is essential to p...

Page 3: ...dency to settle unevenly resulting in an unlevel spa Remember placing the spa on grass or dirt may increase the amount of debris which is inadvertently brought into the spa water on the user s feet If...

Page 4: ...sured operator For a charge the crane operator will lift your spa over walls buildings or any other obstruction and place it as close to the installation site as possible The Caldera spa delivery pers...

Page 5: ...einforced concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Geneva and Niagara must not be shimmed in any manner Geneva and Niaga...

Page 6: ...before making critical design or pathway decisions NOTE Watkins Manufacturing Corporation recommends that the Tahitian Aspire and Hawaiian be installed on a minimum 4 thick reinforced concrete pad or...

Page 7: ...d concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Elation must not be shimmed in any manner Elation Aquatic Melodies model only...

Page 8: ...a before making critical design or pathway decisions NOTE Watkins Manufacturing Corporation requires that the Moorea be installed on a minimum 4 thick reinforced concrete pad or structurally sound dec...

Page 9: ...ritical design or pathway decisions NOTE Watkins Manufacturing Corporation recommends that the Martinique be installed on a minimum 4 thick reinforced concrete pad or structurally sound deck able to s...

Page 10: ...m 4 thick reinforced concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Kauai must not be shimmed in any manner Kauai Paradise mod...

Page 11: ...vice panel to the subpanel The equipment pack requires a MINIMUM of 112 volts per line under load The grounding conductor must be at least 10 AWG Your electrician should mount the subpanel in the vici...

Page 12: ...hat the exterior fiber optic light cable will fit into the fixture Slightly pull on door or panel if door remains against the spa then replace the screws If the door does not lock into position repeat...

Page 13: ...tor MonarchSilver Ion Purifier Cartridge MonarchMPS non chlorine oxidizer Monarch MPS test strips Retractable cover system with clearance requirements ProLift 14 Clearance Required ProLift II 24 Clear...

Page 14: ...Pre Delivery Instructions Page 14 NOTES...

Page 15: ...Page 15 NOTES...

Page 16: ...cted circuit 7 0 x 7 0 213cm x 213cm AspireTM 36 91cm 100 sq ft 10 sq m 380 gallons 1 438 l 800 lbs 363 kg 5 180 lbs 2 350 kg 105 lbs sq ft 540 kg m 230 volt 30 or 50 amp Single phase GFCI protected c...

Reviews: