P
OCKET
R
EFERENCE
G
UIDE
— 4
s
Square-Up Key
—
Calculates the “Square-up”
(diagonal) Length given
entered Length and Width
values.
d
Drop Key
— Calculates
total drop (or fall) over an
entered Length given
entered percentage drop,
Inch per Foot drop, or
degrees of drop. Continued
presses will act as a “con-
stant add,” for displaying
successive drops.
Excavation/Volume Keys
¬
Loads Key
— Calculates
number of loads for a given
Volume or Length, Width,
and Height (Depth) values
and stored load size.
S ¬
Load Size
— Stores load
size. Load size must be
entered as a cubic value
(e.g.,
8 y y y
S ¬
). The default size
is 8 cubic Yards.
F
Cut/Fill Key
— Used to
enter or calculate the cut or
fill amount. Based on entries
of proposed and existing
benchmarks. A fill is dis-
played as a positive value; a
cut as a negative value.