background image

www.cagsanmerdiven.com

Assembly and

 

us

er manual

TELESAFE S-XL

SCAFFOLDING SYSTEMS

The instructions for the assembly 

and use shall be followed carefully

EN1004

202003-IE-1230

Summary of Contents for TELESAFE S-XL

Page 1: ...www cagsanmerdiven com Assembly and user manual TELESAFE S XL SCAFFOLDING SYSTEMS The instructions for the assembly and use shall be followed carefully EN1004 202003 IE 1230 ...

Page 2: ... 2 9 Guarantee Conditions 7 2 10 Connecting the Q Lock System 8 2 11 Locking the Wheels 8 2 12 Opening of Balance Foot 8 2 13 Check List 8 2 14 Labels Used on Telesafe Scaffolding System 9 2 15 TeleSafe Scaffold System Compounds 10 2 16 TeleSafe S XL Scaffold Configuration Table 11 3 TeleSafe S XL Aluminum Scaffold System Assembly Method 12 3 1 TeleSafe S004 XL Scaffold Assembly Method 12 3 2 Tele...

Page 3: ...Safety me asures for weather conditions which may negatively affect security of the TeleSafe Scaffolds Permitted load Other risks to occur as a result of abo ve mentioned assembly disassembly or transformation works The people who are responsible for the job shall be able to reach this handbook Only original Çağsan Merdiven parts should be used for assembly Standard Çağsan Merdiven TeleSafe Scaffo...

Page 4: ...at are affected by wind such as open constructions building corners etc Scaffold usage should be stopped under wind powers that exceed 38 km h max 6 Beaufort It should not be transferred If possible it should be fixed to the wall and Tele Safe Scaffold should be transferred to a place without wind when the wind power decreases Diagram 4 National regulations and the measures should be taken into co...

Page 5: ...latch system is drifted away from the step D 2 Lower the scaffolding from both si des at the same time E Stop lowe ring the scaffolding when you reach the desired height F By pulling down the rope operated system let the upper latch go over the step G 3 Settle the latch on the step by lowe ring the rope slowly H 2 4 Check List for Usage of Tele Safe Scaffold In the first usage or reusage of an alr...

Page 6: ... Examination Storage and Maintenance TeleSafe Scaffold parts should be car ried and transported carefully in order to avoid damages Storage should be organized in a way that it will only contain number of parts necessary for the correct instal lation of TeleSafe Scaffold All moving parts should be checked for correct operation and it should be ensured that they are not worn All parts should be che...

Page 7: ...is instruction and its usage purpose it shall be under the guarantee with the fol lowing conditions 4 Çağsan Merdiven guarantees the reli ability of the product and the quality of the materials used for the product 5 If there is a fault in production the faulty part or the product is replaced under the guarantee scope and the problem is solved 6 The faults that are not covered with the guarantee a...

Page 8: ...ts must not be used again Aids and safety device It is checked if all components tool and safety devices ropes etc for the assembly of the mobile access and working tower on the application site are available Ladders Check for any damage and cracks on the carrier profiles and step profiles Control physically by eye Horizontal and diagonal braces Check for any damage and cracks check that the fixtu...

Page 9: ...yınız Do not climb outside Nicht nach draußen klettern 1 2 11 3 4 10 5 8 9 12 6 7 2020 2021 2022 max USE THE SCAFFOLDINGS AS SHOWN AT THE PICTOGRAMS İSKELELERİ ŞEKİLLERE UYGUN KULLANINIZ HERSTELLUNGSDATUM www cagsanmerdiven com ÇAĞSAN MERDİVEN VE ERİŞİM EKİPMANLARI SAN TİC LTD ŞTİ ÜRETİCİ MANUFACTURER HERSTELLER GEBZE FABRİKA Dilovası OSB 3 Kısım Meriç Cad No 1 Muallim Köyü Gebze KOCAELİ TÜRKİYE T...

Page 10: ...XLMTK Connection Profile 1900mm 75251900SOM Connection Profile 1950mm 75251950SOM Lockable Wheels and Stabiliser Feet 1220mm DA040506XL Lockable Wheels and Stabiliser Feet 1480mm DA07XL Lockable Wheels and Stabiliser Feet 1540mm DA08XL Toeboard TEK45678XL Bakelite Head Bolt AKS000000003 1860mm Stabiliser Supports DBR110001860 Diagonal Braces 1710 mm Q171075 100 Diagonal Braces 2050 mm Q205075 100 ...

Page 11: ...nal Braces 2050mm Q205075 100 1 6 2 2 2 2 2 Diagonal Braces 2480mm Q248075 100 2 2 2 2 2 Diagonal Braces 2500mm Q2500100 2 4 1860 mm Stabiliser Supports DBR110001860 1 2 4 4 4 4 4 Total Weight 104 3 112 3 112 8 138 7 153 1 Description Code Dimensions mm 8 Steps Extension Ladder S004XLMTK 130x2300x750 10 Steps Extension Ladder S005XLMTK 130x2800x750 11 Steps Extension Ladder S006XLMTK 130x3100x750 ...

Page 12: ...and untill they are fully placed Figure 2 nstert the aluminium ladders narrow ones opposingly and the wide ones ones opposingly into the canals on the chassis Figure 3 Screw the bakalite bolts clockwise rotation by hand untill they are fully placed Fix and lock long braces 2x248 cm with Q Lock system in the rung holes for interlocking second step to eighth step Figure 4 Place the platform on the r...

Page 13: ...6 Fix and lock horizontal braces 6x171 cm with Q Lock system into the rung holes of narrow exten sional ladders between sixth seventh and eighth steps for mutual attachment Figure 7 Fix the four pieces of stabiliser 186cm supports from base to ladders by using hand screws and place toeboard to upper platform surface as it covers all corners Figure 8 Tower is ready to use 5 8 7 6 ...

Page 14: ... fully placed Figure 2 nstert the alumini um ladders narrow ones opposingly and the wide ones ones opposingly into the canals on the chassis Figure 3 Screw the bakalite bolts clockwise rotation by hand untill they are fully placed Fix and lock long braces 2x248 cm with Q Lock system in the rung holes for interlocking second step to eighth step Figure 4 Place the platform on the red safe step 1 2 4...

Page 15: ... holes of narrow extensional ladder to the first steps of the opposite ladders Figure 7 Fix and lock horizontal braces 6x171 cm with Q Lock system into the rung holes of narrow extensional ladders between eighth ninth and tenth steps for mutual attachment Figure 8 Fix the four pieces of stabiliser 186cm supports from base to ladders by using hand screws and place toeboard to upper platform surface...

Page 16: ...e fully placed Figure 2 nstert the aluminium ladders narrow ones opposingly and the wide ones ones opposingly into the canals on the chassis Figure 3 Screw the bakalite bolts clockwise rotation by hand untill they are fully placed Fix and lock long braces 2x248 cm with Q Lock system in the rung holes for interlocking second step to eighth step Figure 4 Place the platform on the red safe step 1 2 4...

Page 17: ...holes of narrow extensional ladders to the first step of the opposite ladders Figure 7 Fix and lock horizontal braces 6x171 cm with Q Lock system into the rung holes of narrow extensional ladders between ninth tenth and eleventh steps for mutual attachment Figure 8 Fix the four pieces of stabiliser 186cm supports from base to ladders by using hand screws and place toeboard to upper platform surfac...

Page 18: ...fully placed Figure 2 nstert the aluminium ladders narrow ones opposingly and the wide ones ones opposingly into the canals on the chassis Figure 3 Screw the bakalite bolts clockwise rotation by hand untill they are fully placed Fix and lock long braces 2x248 cm with Q Lock system in the rung holes for interlocking fourth step to tenth step Figure 4 Place the first platform on the red safe step 3 ...

Page 19: ...k system into the step holes of narrow extensional lad ders between third steps for mutual attachment Figure 8 Fix and lock horizontal braces 6x171 cm with Q Lock system into the rung holes of narrow extensional lad ders between eleventh twelfth and thirteenth steps for mutual attachment Figure 9 Fix the four pieces of stabiliser 186cm supports from base to ladders by using hand screws and place t...

Page 20: ... nstert the aluminium ladders narrow ones opposingly and the wide ones ones opposingly into the canals on the chassis Figure 3 Screw the bakalite bolts clockwise rotation by hand untill they are fully placed Fix and lock long braces 4x250 cm with Q Lock system in the rung holes for interlocking second step to eighth step and ninth step to fifteenth step Figure 4 Place the first intemediate platfor...

Page 21: ...m on the red step Figure 7 Fix and lock short hori zontal braces 8x171 cm with Q Lock system into the step holes of narrow extensional ladders fourth fifth sixth and thirteenth fourteenth fifteenth step by mutual connection Figure 8 Fix the four pieces of stabiliser supports from base to ladders by using hand screws Place toeboard to upper platform surface as it covers all corners Figure 9 Tower i...

Page 22: ...22 www cagsanmerdiven com 4 TeleSafe S XL Aluminum Scaffold System 3D Images TeleSafe S004 XL TeleSafe S005 XL TeleSafe S006 XL 2 75 m 3 83 m 4 42 m ...

Page 23: ...23 www cagsanmerdiven com 4 TeleSafe S XL Aluminum Scaffold System 3D Images TeleSafe S008 XL 6 05 m TeleSafe S007 XL 5 23 m ...

Page 24: ...part of this document may be printed or copied Cagsan Merdiven ve Erisim Ekipmanlari San Tic Ltd Sti Gebze Factory Dilovasi Organize Sanayi Bolgesi 3 Kisim Meric Cad No 1 Muallim Koyu Gebze Kocaeli TURKEY Balıkesir Factory Gaziosmanpasa OSB Mah 17 Cad No 11A Altieylul Balikesir TURKEY t 90 262 759 18 08 f 90 262 759 18 78 bilgi cagsanmerdiven com tr www cagsanmerdiven com ...

Reviews: