![Caesar Fireplace CHFP-74A Installation And Operating Instructions Manual Download Page 10](http://html1.mh-extra.com/html/caesar-fireplace/chfp-74a/chfp-74a_installation-and-operating-instructions-manual_3289400010.webp)
A
Fix the pillar and plate with 4 screws, as shown in the figure (A).
B
Upend the box, then fix it and base with 4 screws at the bottom of the box, as shown in the figure (B).
C.
Fix another two plates and base with 4 screws. Base installation is finished, as shown in the figure (C).
D.
Put the hooks on the both sides of glass door into the holes in the box. Then push down the glass door to its place.
.
.
FRONT
VIEW
74 (1880mm)
"
25-1/2 (648mm)
"
A
C
B
A
C
B
5.3 FREE STANDING INSTALLATION (OPTION)
SIDE
VIEW
SIDE
VIEW
22-3/4 (578mm)
"
4 (102mm)
"
Power Line
FRONT
VIEW
Screw×4
Wall anchor×4
SIDE
VIEW
A
Leave a frame in the wall, the size is W68-1/2"
×
H22-3/4"
×
D4".
B.
Have
two
people put
the
box
into
the
wall, and
fix
the
box
to
the
wall
with
self
-
tapping
screws.
C.
Put
the
hooks
on
the
both
sides
of
glass
door
into
the
holes
in
the
box.
Then push down
the
glass door
to
its
place.
D.
Check
the
appliance
for
stability,
ensuring
that
the
appliance
will
not
b
reak
free
from the
wall.
.
10
5.2 RECESSED INSTALLATION
68-1/2 (1740mm)
"
22-3/4 (578mm)
"
Screw×16
Screw×8