![Cadex C8000 User Manual Download Page 196](http://html1.mh-extra.com/html/cadex/c8000/c8000_user-manual_3250378196.webp)
C8000 Battery Testing System User Manual
184
The top portion of the
Add Custom Program
window shows the
individual steps in the program. For each step, BatteryLab
displays the step number, the action that will be performed, the
amount of time the action will take to execute, the type of test to
be performed and action to take if the test is True or False.
Note:
If there is “No Test” the program will automatically go to the next
step, on a successful completion of the action/step.
When this program executes, the steps are performed in the order
listed. To change the order of the steps, select the step and click
Move Up
or
Move Down
. The steps will be rearranged
accordingly.
3.10.4.1
Add a Step to a Program
To add a step to a program, click
Add
. The
No Action
step appears
in the
Program Editor
window.
Click the
Action
field to see the list of possible actions for this step.
Some actions require additional information, as shown in the
following table.
Summary of Contents for C8000
Page 12: ......