GRACE3 - SPIRIT3 - MADISON - TABLA - ROXY - ATRIUM - SOLO 5
16
resistant plate on the concerned walls.
• In some countries also masonring load-bearing walls are considered flammable.
5.4
STOVE DOOR REMOVAL/INSTALLATION
DOOR REMOVAL
For some operations (e.g.: side panel assembly and cleaning) you must remove the stove door.
To remove the door:
• Open the door.
• Use a screwdriver to rotate the lever in the direction of the arrow (vedi
Fig. 20
).
• Lift the door to allow the door pivots to slide out of the structure bracket (see
Fig. 21
).
• Keep the door in a safe place until next use.
Fig. 20 - Remove screws
Fig. 21 - Door removal
DOOR ASSEMBLY
To assemble the door you must centre the pivots fixed to the door, on the structure bracket.
After having mounted the door with the screwdriver, lift the lever so that the door is locked.
5.5
GRACE
3
FRAME ASSEMBLING
METAL
• Remove the door (see the dedicated chapter).
• Place the coloured panels on a top (see
Fig. 22
).
• Fix the 4 panels together using the supplied screws (see
Fig. 23
and
Fig. 24
).
Fig. 22 - Panels on top
Fig. 23 - Panel 1 fixing
Fig. 24 - Panel 2 fixing
• Once the frame is made (see
Fig. 25
), hook it to the stove using the special teeth (see
Fig. 26
).
• Lock the frame with 2 screws (see
Fig. 27
).