background image

Summary of Contents for CBMAAA

Page 1: ...e appliance and affix the booklet adjacent to the appliance after servicing C US Use of the AttRI Certified TM Mark indicates a manufacturer s participation in the program For verification of certification for individual products go to www ahridirectory org Copyright 2011 CAC BDP 7310 W Morris St Indianapolis IN 46231 Printed in U S A Edition Date 11 11 Manufacturer reserve8 the right to change at...

Page 2: ...Figure 15 Figure 16 Figure 17 Table 1 Table 2 Table 3 Table 4 Table 5 Table 7 Table 8 Table 9 Table 10 Table 11 Table 12 Counterflow position flue pipe rotection 5 Wiring diagram BVSO 8 Blocked vent shut off device wrong upflow installation with vertical exhaut 8 Blocked vent shut off device wrong upflow installation with vertical exhaust 9 Blocked vent shut off device wiring upflow installation w...

Page 3: ...or material damage ENVIRONMENTAL HAZARD Failure to follow this caution may result in environmental pollution Remove and recycle all components or materials i e oil electrical and electronic components insulation etc before unit final disposal 1 2 SAFETY INSTALLATION REQUIREMENTS For use with grade 2 fuel oil maximum Do NOT use gasoline crankcase oil or any oil containing gasoline Never burn garbag...

Page 4: ...stem MUST be checked to determine that it is the correct type and size m Install correct filter type and size n Unit MUST be installed so that electrical components are protected from direct contact with water Your unit is built to provide many years of safe and dependable service provided it is properly installed and maintained However abuse and or improper use can shorten the life of the unit an...

Page 5: ...tion instructions included with the kit The furnace should be located as closely as possible to the chimney or vent in order to keep vent connections short and direct The furnace should also be located near the centre of the air distribution system 2 4 1 Air for combustion and ventilation This furnace should be installed in a location in which the facilities for ventilation permit satisfactory com...

Page 6: ...s to facilitate balancing the system Dampers should be adjusted such a way as to ensure the proper static pressure at the outlet of the furnace b A flexible duct connector of non combustible material should be installed at the unit on both the supply and return air side In applications where an extremely quiet operation is necessary the first 3 m 10 of supply and return ducts should be internally ...

Page 7: ...he inside wail i The chimney must extend 0 9 m 3 above the highest point where it passes through a roof of a building and at least 0 6 m 2 higher than any portion of a building within a horizontal distance of 3 m 10 It shall also be extended at least 1 5 m 5 above the highest connected equipment flue collar j Check local codes for any variances Factory Built Chimneys Approved factory built chimney...

Page 8: ...PTYO f P S Sa _ 8VSO RED BLACK WHITE vIOLET BLUE _ _N SE YELLOW YELLO hi LIMIT L L2 _L E PRIMARY CONTROL IGNITION MOTOR TC_ CAD CELL TO 3_0 SELL TO RE IOTE LOW iOL GE x C LARk 31DSUIT IF t SED O_ BELECTE I ODELS 24 AC THERb OSTAT DNS 01340 Rev A Beckett Burner 120vAC FROM APPLIAbCE Lli IT CIRCLIT OR AGEASTAT N k T NEUTkAL i ol oi V SAFETY LIMIT SWITCH 0 BURNER CONTROL BOX FsCTORY RED Riello Burner...

Page 9: ...evice wiring downflow installation L Connection gh limit contacts See Figure 2 0 0 DNS 1043 Rev A 2 4 6 Oil burner This furnace is supplied with a high pressure atomizing retention head type burner for use with not heavier than grade 2 Fuel Oil If the burner model is a Beckett AFG the mounting flange is fixed to the burner air tube and no adjustment is required for length If a RielIo burner is use...

Page 10: ...refer to Table 2 for filter rack flange dimensions for return air duct _1_ DANGER 2 4 9 Air Conditioner or Heat Pump An air conditioning coil may be installed on the supply air side ONLY POISONOUS CARBON MONOXIDE GAS HAZARD Install the evaporator coil on the supply side of the furnace ducting ONLY An evaporator coil installed on the return air side of the ducting can cause condensation to form ins...

Page 11: ...il locking screws are well tightened 3 The Blocked Vent Shut Off BVSO is installed according to instructions for chimney venting 4 The oil supply valve is open 5 The flame observation door and the two clean out access doors located at the front of the unit or well closed 6 The burner Reset button is well pushed in or re armed 7 The preliminary air adjustments on the burner comply with the technica...

Page 12: ...or proper functioning see instructions included with damper After the furnace has been firing for at least five minutes the draft regulator should be set to between 0 025 W C and 0 035 W C 5 The over fire pressure that is taken through the observation door located in the centre of the front panel above the burner is a measurement that is necessary to determine if there is a blockage in the heat ex...

Page 13: ... flue pipe and oil line 10 Readjust burner for proper operation 4 2 BLOWER REMOVAL To remove the blower from the furnace 1 Turn OFF all utilities upstream from the furnace 2 Remove the burner access door and blower door 3 Remove the blower retaining screw on the blower partition panel 4 Remove the control box cover and disconnect the thermostat and power wires from the board 5 Slide the blower on ...

Page 14: ...Day Dealer name and address Serial number Night START UP RESULTS Nozzle Burner adjustments CO2 scale Gross stack temperature Ambient temperature Chimney draft Overfire draft Test performed by Primary air Fine air Drawer Assembly Smoke Pressure I 1 W C W C Bacharach Ib po 2 14 ...

Page 15: ...4181 8 85 1183 8 I 83 0 AFUE max FromASHRAE 103 stadard and US regulation 82 5 J 82 0 J 82 0 83 0 J 82 5 J 82 5 Volts Hertz Phase 115 60 1 115 60 1 Rated current Amps 12 2 15 7 Minimum ampacity for w ire sizing 13 7 18 1 Max w ire lenght ft 26 26 Max fuse size Amps 15 20 Control transformer 40 VA 40 VA External control pew er available Heating 40 VA 40 VA Cooling 30 VA 30 VA B owerspeedat0 50 W C ...

Page 16: ... 1 t i 422 mrs T DNS 0159 evE Table 7 Minimum clearances to combustible materials FURNACE SUPPLY PLENUM WITHIN 6 ft OF FURNACE FURNACE FURNACE OR PLENUM HORIZONTAL WARM AIR DUCT WITHIN 6 ft OF FURNACE M1 FURNACE COMBUSTIBLE FLOOR WITH SUB BASE 1 HOR Z ONTALLY OR BELOW FL UE P PE VERTICALLY ABOVE FLUE PIPE _O_ 4 FURNACE Q 5 08 cm 2 5 08 cm 2 2 54 cm 1 5 08 cm 2 2 54 cm 1 O 2 54 cm 1 5 08 cm 2 5 08 ...

Page 17: ...QUE OTES 84 477 rnr_ FR0 b T DEVA NT D B 0141 Re_E Table 8 Minimum clearances to combustible materials su FURNACEy PLENUM W H N 8 OF OE FURNACE FURNACE OR PLENUM HORIZONTAL WARM AIR DUCT WITHIN 6 ft OF FURNACE FURNACE COMBUSTIBLE FLOOR WITH THESUB BASE 1 HOR ONTALLY OR B OW FLUE VERTICALLY ABOVE FLUE PIPE FURNACE _b 2 54 cm 1 _b 5 08 cm 2 5 08 cm 2 _b 10 16 cm 4 22 86 cm 9 20 32 cm 8 5 08 cm 2 5 0...

Page 18: ...R SUP _LY N6 2 CN6 4 NB 7 _ R E_ s L E x REMOVE JUMPER AND CONNECT RED WIRE TO THE HEAT TERMINAL WHEN DIFFERENT HEATING _ COOLINO BLOWER SPEED ARE REQUIRED REFER TO INSTRUCTION MANUAL ALSO _ JSE ONLY OIL P qMARY CONTROL EQ IP ED WITH VALVE ON DELAY PAE P ROE Ri1S4B P Od U sx SE CONSTANT IONITION ONLY NEVER USE THE INTERR PTED IONITION AND OR THE BLUE WIRE ON R7154 CONTROL U_E ONLY COPPE WlI _E FOR...

Page 19: ... ELECTRICAL CONNECTION MANDATORY DIRECT vENT AFPLICATION ONLY JSE ONLY COPPER qRE FOR H MI IFIER REMO E THE UMMY TERMIN L I RKE HJM FOR ELECTRONIC AIR CLE NER RE lOvE THE TERMIN L M RKED EA C H 15 z_C pb 60HZ O ER SUPF LY FSED DISCONNECT ON HOT LEO s2 _o_OR L2 N LIMIT S QTY OR 2 AND BLOKED VENT SHJT OFF VANDATORY FOR CANADA ONLY SN6 2 K4 _E3134_3134 N7 CN7 3 BOARD _1i58 20 ec I 6 bin BLOWER ON I B...

Page 20: ...N C oo _ c J 11 r i W C_ O_ CP J1 ...

Page 21: ... Brass Hexagonal Nut3 8 16NC Zinc Beck ett Burner Recessed Handle Black Latch Male Front Door Blower Door Assembly Electrical Box Cover Replacement Blower Assembly Floor High Limit Protective Shield High Limit 140F 7 Observation Door Assembly Blower Slide Support Blower Divider Left Lateral Baffle Left Side Panel Assembly Side Panel Insulation Filter Rack Access Filter Rack Frame Seal Strip 1 1 2 ...

Page 22: ...r r oo i i i i i i t i A j j_ j 11 tl Ill i IlU a_ i ...

Page 23: ...ON HEX NUT 3 8 16NC ZINC BURNER ASSEMBLY LATCHE MALE RECESSED HANDLE BLACK FRONT DOOR BLOWER DOOR ASSEMBLY ELECTRICAL BOX COVER REPLACEMENT BLOWER ASSEIVBLY FLOOR HIGH LIMIT PROTECTIVE SHIELD LIMT CONTR OL140F 7 OBSERVATION DOORASSEIVBLY BLOWER SLIDE SUPPORT BLOWER DIVIDER LEFT SIDE BAFFLE LEFT SIDE PANELASSEIVBLY SIDE PANEL INSULATION FILTER RACK ACCESS FILTER RACK FRAIVE PAPER FILTER 20 X 30 X 1...

Page 24: ...r J oo 00 _o o J J i m r u F i W ...

Page 25: ...Zinc Riello Burner R40 F3 Recessed Handle Black Latch Male Front Door Blower Door Assembly Eleclrical Box Cover Re place me nt BIowe r As sem bly Floor High Limit Protective Shield High Limit 140F 7 Observation Door Assembly Blower Slide Support Blower Divider Left Lateral Baffle Left Side Panel Assembly Side Panel Insulation Filter Rack Access Filter Rack Frame Seal Strip 1 1 2 x 13 1 8 Blower Sl...

Page 26: ...oo co j i t_ 11 o o C_ 0_ C_ CP ...

Page 27: ...L BOX COVER 24 B01406 01 REPLACEMENT BLOWER ASSEMBLY INCLUDES BLOWER MOTOR AND CAPACITOR 25 B01804 FLOOR 26 A00284 HIGH LIMIT PROTECTIVE SHIELD 27 R02R002 LIMIT CONTROL 140F 7 28 B02111 OBSERVATION DOOR ASSEMBLY 29 B01794 BLOWER SLIDE SUPPORT 2REQUIRED 30 B01795 BLOWER DIVIDER PANEL ONLY 31 B01805 02 LEFT SIDE BAFFLE 32 B01875 02 LEFT SIDE PANEL ASSEMBLY INCLUDES PANEL INSULATION AND BAFFLE 33 B01...

Page 28: ...ns ce manuel afin d effectuer l entretien de l appareil Garder ce manual pros de l unitd pour rdfdrences ultdrieures C US Use of the AttRI Certified TM Mark indicates a manufacturer s participation in the program Por verification of certification for individual products go to www ahridirectory org Copyright 2011 CAC BDP 7310 W Morris St Indianapolis IN 46231 Printed in Canada Edition Date 11 11 Le...

Page 29: ...ranchement du systeme anti refoulement installation en debit d air ascendant et evacuation verticale 9 Branchement dispositif anti refoulement installation debit ascendant et evacuation verticale 10 Branchement dispositif anti refoulement installation debit ascendant et evacuation horizontale 10 Branchement dispositif anti refoulement installation horizontale avec evacuation horizontale 10 Branche...

Page 30: ...d instalIation d equipements de chauffage au mazout Installation d equipements de chauffage au mazout Systemes de chauffage a air chaude et systeme d air climatise Cheminees foyers events et appareils de chauffage au combustible soIide Code national d electricite Code canadien d eIectricite Seule I edition la plus recente des codes doit _tre utilisee Les codes sont disponibtes aux adresses suivant...

Page 31: ...i previendra Ies decharges eIectriques et Ies brQIures k SceIIer Ies conduits d aIimentation et de retour d air I Le systeme d evacuation DOlT _tre verifie pour s assurer qu iI est de Ia dimension et du type requis m Installer Ie format adequat et te bon type de fiItre n L appareiI DOlT _tre instalIe de teIIe sorte que les composantes eIectriques soient protegees de tout contact direct avec I eau ...

Page 32: ...ge qui va etre chauffe iI peut _tre suspendu ou instaIle dans un vide sanitaire Dans tous Ies cas iI doit etre instalIe au niveau Si I appareiI de chauffage central est instalIe dans un sous sol ou sur Ie sol dans un vide sanitaire par exempte iI est recommande d instaIIer I unite sur une base en beton de 25 4 mm a 50 8 mm 1 a 2 d epaisseur Quand I appareiI de chauffage central est installe avec u...

Page 33: ...Ies foyers doit etre considere pour determiner un endroit capable d approvisionner Ia quantite d air requise pour Ia combustion Si I espace confine est situe dans un b_timent de charpente conventionneIIe dont Ia construction en briques ou en pierres Ies infiltrations pourraient etre suffisantes pour fournir Fair requis pour Ia combustion Ia ventilation et Ia dilution des gaz de combustion Cette de...

Page 34: ...paraIIeIe des cIapets doivent _tre instalIes pour diriger I air au dessus de I echangeur d air de I appareiI de chauffage central quand Ie chauffage est demande et au dessus du serpentin de refroidissement si Ia cIimatisation est desiree 2 4 3 Instructions d evacuation cheminee L evacuation de I appareiI de chauffage central devrait se faire a I exterieur en respectant Ies codes Iocaux ou Ies exig...

Page 35: ...combustion I interrupteur thermique permet I arret du brQIeur au mazout Le dispositif requiere une remise en fonction manueIIe Pour I installation et Ie c_btage electrique veuilIez vous referer aux figures 2 a 8 aux diagrammes eIectriques de I unite figures 12 et 13 et aux instructions detainees fourni avec Ie dispositif d arret anti refoulement Pour que Ie c_btage eIectrique fourni avec I unite s...

Page 36: ...Rev Br01eur Beckett 120VAC FROM _PPLI _ _CE LIblT CIRCUIT OR AOt _STAT N k FR_L o L SAFETYLIMIT S fflTSH z T BUR ER COI TROL BOX FACTORY WIRED Br01eur Riello Figure 3 Branchement du systeme anti refoulement installation en debit d air ascendant et evacuation verticale La position du trou dans Ie tuyau d evacuation est determin6e en fonction de Ia Iongueur du kit eIectrique I o o _ _ Dispositif d a...

Page 37: ... 1043 Rev A Figure 8 Branchement dispositif anti refoulement installation descendant L Connexion a la iimite haute Voir Figure 2 DNS 1043 Rev A 2 4 6 Br01eur au mazout Cet appareil de chauffage central vient avec un brQIeur t6te de retention a atomisation haute pression Ne pas utiIiser du mazout plus Iourd que 2 Sur Ies modeIes avec brQIeur Beckett AFG Ia bride de montage est fixee au tube d air d...

Page 38: ... Les instructions pour I instalIation electrique du thermostat sont embalIees dans Ia boTte du thermostat fourni sur place Effectuer Ies connexions du thermostat telIes qu indique sur les figures 12 et 13 et aux bornes du panneau 24 volts du reIais primaire Si vous instalIez des accessoires optionnels sur cet appareiI suivez Ies instructions d instaIIation du manufacturier inclus avec I accessoire...

Page 39: ... 0 75 USGPH 0 85 USGPH 1 00 USGPH 1 10 USGPH VITESSE DE VENTILATION RECOMMEND E MED LOW MED HIGH HIGH MED LOW MED HIGH HIGH Pour faire I ajustement Ies ills ROUGE et BLEU peuvent _tre deptaces sur Ie moteur Verifier aussi que Ia position des fiIs sur Ie contrSte eIectronique de I unite est tel que specific sur Ie diagramme eIectrique Si Ia vitesse de chauffage et de cIimatisation est identique Ie ...

Page 40: ...ns techniques 1 3 I aide de Ia trousse de test mesurer Ia densite de Ia fumee Ie tirage au tuyau d evacuation et Ia pression ou Ie tirage au dessus de Ia flamme afin d obtenir un bon ajustement de Ia bande d air Meme si toutes ces mesures sont requises pour un ajustement optimal et des donnees efficaces Ia lecture Ia plus importante est Ie niveau de fumee qui doit etre mesure dans Ie tuyau d evacu...

Page 41: ...al est equipe pour Ia climatisation Ies filtres devraient etre remptaces au moins deux fois par annee Pour eviter des btessures s assurer que Ie courant eIectrique est coupe AVANT de commencer Ia maintenance TOUJOURS FERMER LA VALVE DU RESERVOIR AU MAZOUT QUAND LE BROLEUR EST ARRC T POUR DE LONGUES P RIODES Pour obtenir une performance optimaIe Ie gicIeur du brQIeur au mazout devrait etre remptace...

Page 42: ...ifie RISQUE DE CHOC I_LECTRIQUE 1 Devisser Ies deux vis qui fixent Ie couvercIe du dispositif d arr_t 2 EnIever Ie couvercIe 3 EnIever Ies deux vis qui maintiennent Ie boftier de commande a I ensembte du tube de transfert de chaIeur En gtissant Ie boftier de commande dans Ia bonne direction Ie tube de transfert de chaleur se detachera 4 EnIevez soigneusement n importe queIIe accumulation de Ia sur...

Page 43: ... service Numero de serie Soir RI_SULTAT DU TEST DE MISE EN MARCHE Gicleur Ajustements du brt3Ieur Bande principale Pression Bande fine Position de Ia t_te 002 Temperature des gaz a Ia sortie de I unite Temperature ambiante Tirage dans Ia cheminee Tirage au dessus du feu Examine par Indice de fumee Bacharach I I C E C E Ib po 2 16 ...

Page 44: ...d ASHRAE 103 et des lois arr_ricaines 115 60 1 115 60 1 12 2 15 7 13 7 18 1 26 26 15 20 40 VA 40 VA 40 VA 40 VA 30 VA 30 VA Vit du ventilateur a une pression statique de 0 50 MED LOW MED HIGH I HIGH MED LOW I MED HIGH I HIGH m m m Moteur HP nombre de vitesses 1 3 HP 4 vitesses 3 4 HP 4 vitesses 10 x 10 12 x 10 _AT O_ Volts Hertz Phase Consomn ation An Amp minimum p r grosseur du fil Longueur n ax ...

Page 45: ...minimum materiaux combustibles EMPLACEMENT APPLICATION FOURNAISE COTI S PL NUM D ALIMENTATION JUSQU ik 6 PI DE LA FOURNAISE ARRIERE FOURNAISE FOURNAISE OU PLENUM HORIZONTALE A LA CONDUITE PREMIERS 6 PI DESSOUS FOURNA ISE PLA NCHER COMBUSTIBLE AV EC BASE 1 HORIZONTALE OU SOUS LE TUYAU A FUMEE TUYAU A FUME VERTICALE AU DESSUS DU TUYAU A FUMEE DEVA NT FOURNA ISE ASCENDANT O 2 54 cm 1 O 5 08 cm 2 5 08...

Page 46: ...bleau 8 Degagement minimum materiaux combustibles EMPLACEMENT APPLICATION ASCENDANT DESCENDANT HORIZONTAL FOURNAISE O 5 08 cm 2 5 08 cm 2 COT S PL NUM D ALIMENTATION JUSQU A 6 PI DE LA FOURNAISE 2 54 cm 1 5 08 cm 2 2 54 cm 1 ARRIERE FOURNAISE O 2 54 cm 1 O FOURNAISE OU PLENUM 5 08 cm 2 5 08 cm 2 5 08 cm 2 DESSUS HORIZONTALE A LA CONDUITE PREMIERS 6 PI 5 08 cm 2 5 08 cm 2 7 62 cm 3 DESSOUS FOURNAIS...

Page 47: ...HE HEAT TERMINAL WHEN DIFFERENT HEATIN 84 COOLIN BLOWER SPEED ARE REQUIRED REFER TO INSTRUCTION MANUAL ALSO USE ONLY OIL PRIMARY CONTROL EO IPPED WITH VALVE ON DELAY PRE PUR E R SdB P OR U SE CONSTANT IONITION ONLY NEVER USE THE INTERRLPTED ICNITI N AND OR THE BLUE WIRE ON R 84 ONTROL USE ONLY COPPER WIRE 115 iAC iph 60HZ POV ER SUPPLY CNB 7 4_ d EM L E oK _ _SFi _ cK i4 V_ HU _ IDIFIER FOR HtMItl...

Page 48: ...I O tSE ONLY SOPPER _ IRE F R HUbI IFIER RE OVE THE D v_ YTER qNAL bARKED H K _ F3R ELECTAONI S 1A CLEANER AEVO _E THE D Jb Y TEA INAL lARKED EAC 11 3 I D CD 2_ ...

Page 49: ...oo _ c J 11 r im Q a 0 W C_ a_ CP J1 ...

Page 50: ...MALE PORTE AVANT ASS FORTE DU VBNTI LATEUR COUVERCLE DE LA BOITE ELECTRIQUE ASS VENTILATEUR DE REMPLACEMENT PLANCHER PLAQUE DE PROTECTICN POUR HALITE LIMIT HALITE LIMITE 140F 7 ASS FORTE D OBSERVATION GLISSIERE DU VENTILATEUR SEPARATEUR DU VENTILATEUR DEFLECTEUR LATERAL GAUCHE ASS PANNEAU COTE GA ISQLATICN PANNEAU DE COTE EMBOUT SUPPORT DE FILTRE CONTOUR SUPPORT DE FILTRE BANDE SCELLANTE 1 I Z X 1...

Page 51: ...g i i i i i i t i A 13 tll Ill IlU a_ i ...

Page 52: ...ASTRENOR PCRTEAVANT ASSFQRTEDUvBXrFILATEUR Q3LMBRCLEDELABOiTEELECTRIQUE ASSVENll L kTEUR DE REMq_ACFMB_II P ER PLAQUEDEPROTECTION POURHAUTELIMTE HAUTEUMTE 140F 7 ASSI OR FE E OBS_AIIC_I GUSSIEREDUVENTILATEUR SBDARATEUR DUVENTILATEUR DEFLECTEUR LATBRAL GAUCHE ASSPANNEAJCOTEGAJCHE ISOLATIQN PANNEAUDECOTE EIVBCUT SUPPCRTDEFILTRE CONTOUR SUPFORTDE FILTRE FILTREPAPIBR 20 X 30X1 B _NDESCB_LANTE 1 1 2 X ...

Page 53: ...oo 00 _o o J J i r F W ...

Page 54: ...ORTEDUVENTILATEUR OOUVERCLE DE LA BOITEFI ECTRIQUE ASSVENTILATEUR DE RBVIPLACEMENT PL _CI IER R_AQUE DEPROTECTION FOUR_ UMT I IAU ELIMITE140F 7 ASSPORTED QBSERVATICfq GUSSIEREDUVB TILATEUR SEPARATEUR DUVENTILATEUR DEFLECTEUR LATERAL C UCH E ASSPANKEAJCOTEC_ ISOLATION PANNEAUDECOTE BVBOUTSUPPORTDEFILTRE QDNTQUR SUPFQRTDEFILTRE BAN3E8CFI LANTE1 1 2 X 131 8 GUSSIERE VENTILATEUR SUPPORT DE BOITEELECTR...

Page 55: ...oo _3 Y i 11 I Q _ _u C_ 0_ C_ CP ...

Page 56: ...CASTRE NOIR PORTEAV _IT ASS FORTEDUVENTILATEUR G3Lt_RCLE DE LABOITEELECTRIQUE ASS VENT LATELRDE REIVPLACEIVENT PLANE HER PLAQUEDEPROTECTI CNPOURHALYrE UMTE HAUTEUMTE 140F 7 ASS FORTEE OBSERVATION GLISSIERE DU VENT LATEUR SERARAT EUR DUVENT LATEUR DEFLECTEUR LATER _ C _UCH E ASS PANNEAUQ TEGAUCHE ISCLATICNPANNEAUDE Q TE EIVBOUTSUPPORTDE FILTRE QD_OUR SUPPCRTDEFILTRE FILTREPARER20X 30X 1 BANDESCELLA...

Reviews: