1-1
Chapter 1
Installing the 9C500 Plus Power Box
The 9C500 Plus Power Box (power box) is installed in a standard 19 inch
equipment rack near the SmartSwitch 9000 9C114 Chassis (chassis) only after two
power supplies (9C214-1 AC or 9C214-2 DC) have been attached directly to the
chassis.
Power supplies are added to ensure adequate power for the modules installed, or
to achieve power redundancy. Two power supplies can be added per power box,
and two power boxes can be installed per chassis. An auxiliary power cord
connects the power box to the chassis.
This guide contains the information necessary to: install a power box(es) in a
standard 19 inch equipment rack, connect the auxiliary power cord to the power
box, attach terminator block (if necessary), install power supplies in the power
box(es), replace a power supply or an auxiliary power cord.
For detailed operational information on other SmartSwitch 9000 components,
refer to the following manuals:
SmartSwitch 9000 Installation Guide
SmartSwitch 9000 Operations Guide
SmartSwitch 9000 9C300-1 Environmental Module User’s Guide
SmartSwitch 9000 9C214-1 AC Power Supply Installation Guide
SmartSwitch 9000 9C214-2 DC Power Supply Installation Guide
SmartSwitch 9000 Module Local Management User’s Guide
INB Terminator Modules Installation Guide
Summary of Contents for SmartSwitch 9000
Page 1: ...9031344 02 SmartSwitch 9000 9C500 Plus Power Box Installation Guide ...
Page 2: ......
Page 6: ...Notice iv ...
Page 8: ...Contents vi ...