9033029
Installation 7
2. INSTALLATION
Inspecting Your Shipment
When you receive the shipment of your switch, check the package
contents and make sure you have the following items:
•
ELS100-8TXUF2 Fast Ethernet switch
•
Mounting velcro
•
Rubber feet
•
Power adapter
•
This document
Site Requirements
Before you install the switch, make sure the site meets the following
requirements:
•
Mounting
Provide a flat table, wall or shelf surface.
•
Power source
Provide a power source within six feet (1.8 m) of the installation loca-
tion. This source must provide 100 VAC to 240 VAC, and 50 Hz to 60
Hz power, with a 100 VA minimum. Power specifications for the
switch are shown in Appendix A, “Technical Specifications.”
•
Environmental
Install the ELS100-8TXUF2 switch in a dry area, with adequate air
circulation. Avoid placing the switch in direct sunlight or near other
heat sources, such as hot-air vents. For temperature and humidity
specifications, see Appendix A, “Technical Specifications.”
•
Ventilation
Do not restrict airflow by covering or obstructing air inlets on the side
of the switch.
ELS100-8TXUF2.book Page 7 Friday, June 4, 1999 4:01 PM
Summary of Contents for SmartSTACK ELS100-8TXUF2
Page 1: ...9033029 SmartSTACK ELS100 8TXUF2 FAST ETHERNET SWITCH INSTALLATION AND USER GUIDE...
Page 2: ......
Page 12: ...Notice x 9033029...
Page 30: ...14 Installation ELS100 8TXUF2...
Page 34: ...18 Technical Specifications ELS100 8TXUF2...
Page 36: ...20 Flow Control ELS100 8TXUF2...
Page 38: ...22 Acronyms and Abbreviations ELS100 8TXFU2...
Page 40: ...24 Index ELS100 8TXUF2...