Installing the 2H28-08R
2H28-08R SmartSwitch 2208 User’s Guide
3-5
Installation
Rack mounting the 2H28-08R involves the following:
•
Attaching the strain-relief bracket
•
Rack mounting the 2H28-08R (attaching the mounting brackets and
fastening the 2H28-08R to the rack)
Attaching the Strain-Relief Bracket
Use of the strain-relief bracket is optional, but recommended in order to
reduce cable damage and maintain an orderly environment.
Attach the strain-relief bracket to the front of the 2H28-08R as follows:
1.
Locate the strain-relief bracket and four 8-32 x 5/16-inch pan-head
screws in the rackmount kit.
2.
Attach the strain-relief bracket to the bottom of the 2H28-08R using
the four 8-32 x 5/16-inch pan-head screws (
Figure 3-2
).
Figure 3-2
Attaching the Strain-Relief Bracket
!
CAUTION
Do not attempt to attach the strain-relief bracket with screws
other than the 8-32 x 5/16-inch screws included with the
2H28-08R. Use of longer screws may damage the unit.
Strain-Relief Bracket
Screws (4)
2251-47
6
5
LINK 1
LINK 1
LINK 1
LINK 1
12
12
12
12
ENET 1
ENET 3
ENET 4
ENET 2
E3
E1
E4
E2
2E43-51
COM
PWR
CPU
RESET
Summary of Contents for 2H28-08R
Page 1: ...2H28 08R SmartSwitch 2208 User s Guide 9032380 03...
Page 2: ......
Page 8: ...Notice vi 2H28 08R SmartSwitch 2208 User s Guide...
Page 26: ...Chapter 2 Network Requirements 2 4 2H28 08R SmartSwitch 2208 User s Guide...
Page 42: ...Chapter 3 Installation 3 16 2H28 08R SmartSwitch 2208 User s Guide...
Page 134: ...Appendix A Specifications A 4 2H28 08R SmartSwitch 2208 User s Guide...