background image

Summary of Contents for 90 Series

Page 1: ...CABLESCAN SERIES 90 REFERENCE MANUAL SECTION 2 0 PART 1 SETUP S ERIES 90 AND SERIES 90HV August 3 1995...

Page 2: ...Page ii 2 0 Setup Series 90 90HV...

Page 3: ...NGING POWER SETTING 4 FUSE REPLACEMENT 5 SYSTEM SETUP 7 CONTROLLER 7 EXPANSION CABINETS 8 ADDITIONAL EXPANSION CABINETS 8 COLOR MONITOR 9 KEYBOARD 9 SCANNER BOARDS 10 SCANNER BOARD JUMPERS 11 CONFIGUR...

Page 4: ...ption 21 Software Installation 23 SERIES 90 FIRMWARE 23 Description 23 Firmware Update Procedure 23 HARD DISK SETUP 26 Directory Structure 26 AUTOEXEC BAT File 26 CONFIG SYS File 26 REMOTE SIGNALS 27...

Page 5: ...Series 90 90HV Power Connections 3 2 Power Setting Location 4 3 Fuse Locations Expansion Cabinet 6 4 System Controller Board Locations 7 5 Controller and Expansion Cabinet Hookup 8 6 Color Monitor and...

Page 6: ...Page vi 2 0 Setup Series 90 90HV...

Page 7: ...ending on the capability ordered there may be other containers for additional expansion cabinets The optional printer is also shipped in an individual container POWER CONNECTION Before applying power...

Page 8: ...ower switch on the front panel By connecting the system controller to the expansion cabinet and leaving the system controller s power switch on both units can be switched on using the expansion cabine...

Page 9: ...net Series 90E9 shown AC Source 2 System Controller 1 3 Monitor 1 Connect Expansion Unit Power Cord to AC source 2 Connect Jumper Power Cord from Expansion Cabinet to Controller 3 Connect Monitor Powe...

Page 10: ...ting change is required see Figure 2 and follow the instructions provided below 1 Partially displace top cover of controller a Tilt unit on edge and remove four bottom screws b Remove five screws arou...

Page 11: ...ews on the bottom ofthe cabinet nearest the sides 2 Slide the top cover forward until it just clears the front of the unit Do not over extend the cover since the front panel switch is wired to the mai...

Page 12: ...rfaces for expansion cabinet and optional remote control head Slot 2 I5 pin female D type connector for remote control signals Slot 5 VGA Color Monitor Adapter has interface for color monitor Slot 7 F...

Page 13: ...INPUT connector on the expansion cabinet 2 VerifY that a terminating plug part no 5210974 is connected to OUTPUT connector on expansion cabinet See below for adding more Expansion Cabinets Expansion C...

Page 14: ...d MONITOR on the controller Make sure that the connectors are secured with the mounting screws KEYBOARD The keyboard is connected to the system controller through an interface cable that comes already...

Page 15: ...board will be installed All scanner boards must be installed consecutively in the card cage without skipping one As shown in Figure 7 scanner boards are installed from the bottom left and inserted fr...

Page 16: ...ch scanner board except for the last board in the cabinet must have a jumper connecting the center pin to the pin toward the center of the board On the last board move the jumper so that the center pi...

Page 17: ...e DOS Install diskette must be run On 386 and 80486 based systems the setup program is in the BIOS ROM on the CPU The setup program also must be run when memory is added to the CPU or when disk drive...

Page 18: ...OT WRITE TO CMOS AND EXIT Standard CMOS Setup for Changing Time Date Hard Disk Type etc Esc Exit Arrows Select F2 F3 Color FlO Save Exit 3 With the cursor positioned on the first line STANDARD CMOS SE...

Page 19: ...29 Esc Exit Arrows Select F21F3 Color PUIPD Modify 1 2 3 4 5 6 7 5 Change settings as necessary to match the above screen Drive type and memory size have changed during production See Configuration T...

Page 20: ...nabled Weitek Processor Absent System Boot Up Sequence A C External Cache Memory Enabled Internal Cache Memory Enabled Password Checking Option Disabled Video ROM Shadow COOO 32K Enabled Adaptor ROM S...

Page 21: ...RD HARD DISK UTILITY WRITE TO CMOS AND EXIT DO NOT WRITE TO CMOS AND EXIT Standard CMOS Setup for Changing Time Date Hard Disk Type etc Esc Exit Arrows Select F2 F3 Color PU PD Modify 3 With the curso...

Page 22: ...9 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Esc Exit Arrows Select F21F3 Color Pu PD Modify I 2 3 4 5 6 7 5 Change settings as necessary to match the above screen Drive type and memory size have chang...

Page 23: ...Switch Function Disabled Password Checking Option Disabled Video ROM Shadow COOO 32K Enabled Esc Exit Arrows Select Ctrl Pu Pdodify FI Help F2 F3 Color F5 0ld Values F6 BIOS Setup Defaults F7 Power On...

Page 24: ...Insert the diskette labeled INSTALL into the 3 5 inch floppy drive on the front of the Controller 3 Press CTRL ALT and DELETE keys simultaneously to warm start the system After a delay the screen will...

Page 25: ...own below Phoenix Technologies Ltd System System Configuration Setup V4 0 Time 10 58 36 Date Thu Sep 06 1990 Diskette A Diskette B Hard Disk C Hard Disk D Base Memory Extended Memorv Display Keyboard...

Page 26: ...is set to represent the revision number of the program The programs and their respective file names are listed below followed by a description ofeach Description Series 90 Main Program Build Program P...

Page 27: ...r Build IMPORT PROGRAM S90PORT EXE The Import Program is used to bring into the Series 90 system additional wire list programs that have been created by other means This includes Model 512 and 4000 wi...

Page 28: ...ner boards Once the correct test points are set up the Scanner Control board performs a measurement and sends the results back to the System Controller The Firmware on each Scanner Board controls that...

Page 29: ...handling procedures Changing Scanner Control Board EEPROM 1 Remove the EEPROM from the socket marked UI5 on the Scanner Control board 2 Install the new PROM in the socket marked UlS Be careful to ali...

Page 30: ...e hex screws securing the 9 pin connectors 3 Insert the termination plug into the connector marked OUTPUT 4 Reconnect the cable between System Controller and Expansion Cabinet 5 Reconnect the power ca...

Page 31: ...shown below are set up to operate from the following directory structure If however the Series 90 software is installed in a different directory the SET commands in the AUTOEXEC BAT file must change...

Page 32: ...r 15 ms END Of TEST and TESTING signals return to a logic high state A PASSIFAIL test status signal is output and occurs approximately 2 ms before the END Of TEST transitions low If the test passed th...

Page 33: ...he Startup Delay from the Test Options The Startup delays can be set from 0 1 to 9 9 seconds in 0 1 second increments OUTPUT CONNECTOR The output connector for remote signals is located on the rear pa...

Page 34: ...ards are to be shipped they should first be placed in anti static bags SHIPPING AND STORAGE If any of the major components system controller or an expansion cabinet is to be removed from use and place...

Page 35: ......

Page 36: ......

Page 37: ...CABLESCAN SERIES 90 REFERENCE MANUAL SECTION 2 0 PART 2 SETUP SERIES 90L4 AND SERIES 90H4 August 3 1995...

Page 38: ...Page ii 2 0 Setup...

Page 39: ...E 1ENT 2 SCANNER BOARDS 4 SCANNER BOARD JUMPERS 5 SOFTWARE AND FIRMWARE 6 SOFTWARE UPDATES 6 Description 6 Software Update Procedure 8 SERIES 90 FIR1vlWARE 13 Description 13 Firmware Update Procedure...

Page 40: ...Pageiv Figure 1 2 3 4 2 0 Setup LIST OF FIGURES Description Page Series 90L4 90H4 Connections 2 Fuse Locations 3 Scanner Board Locations 4 Series 90L4 Scanner Board Jumpers 5...

Page 41: ...y grounded see GROUNDING THE UNIT below POWER CORDS The power cord is supplied with North American type plugs The plug ends must be replaced for countries with another standard To help make the change...

Page 42: ...rough an ungrounded connector or with the grounding conductors disconnected 5ER1E toL4 SERIES IJOH4 I IN l 4YO IT PIN LAYOUT i i i J JltN a 1 i w i l I i _ C_ ___ ___ c __ _____ WUSS Y lAMP POWER PROB...

Page 43: ...ne installed Replacing the fuse with a higher rated fuse can cause permanent damage to the power supply scanner control board and scanner boardso Rear Panel Inside View of Rear Panel SERIES IOU SERIES...

Page 44: ...and disconnect the power cord Power should be shut off on the entire system Remove the front panel All scanner boards must be installed consecutively in the card cage without skipping one As shown in...

Page 45: ...can be installed in one of two locations on the three pin connector Each scanner board except for the last board in the cabinet must have a jumper connecting the center pin to the pin toward the cente...

Page 46: ...ames are listed below followed by a description ofeach Description Series 90 Main Program Build Program Program Editor File Manager Compiler Program Import Program Print Program Statistics Program Tes...

Page 47: ...ld IMPORT PROGRAM S90PORT EXE The Import Program is used to bring into the Series 90 system additional wire list programs that have been created by other means This includes Model 512 and 4000 wire li...

Page 48: ...can modify them yourself To install the software perform the following steps 1 Turn on your PC 2 Execute EXIT TO DOS command through the System category window if the PC automatically boots into the S...

Page 49: ...specified Installing files Press a key to interrupt C S90 S90 OVL C S90 CNTR2 HEX After all files on Disk 1 have been copied to the hard drive the following window will display Please insert disk 2 i...

Page 50: ...m configuration is saved in the Series 90 directory with a file name of SYSTEM DEF If the file exists that file is renamed as SYSTEM NN where NN is an unused numeric number 11 By including a statement...

Page 51: ...ight the appropriate response lfthe you select to allow the installation software to make the changes the following window will open Please indicate your computer boot drive This drive s boot director...

Page 52: ...of the CONFIG SYS file is not correct make the appropriate changes and press ENTER The following information windows will open We saved a backup copy of C AUTOEXEC BAT as C AUTOEXEC 01 Press a key to...

Page 53: ...roblems it may become necessary to update the firmware The procedure for firmware update includes removal of socketed PROMs and replacing them with new PROMs Depending on firmware update requirements...

Page 54: ...the socket marked U58 on each Scanner board Be careful to align the notch pin 1 at one end of the UVPROM with the notch painted on the circuit board under the socket Caution Failure to align the UVPRO...

Page 55: ...he AUTOEXEC BAT and CONFIG SYS files as shown below are set up to operate from the following directory structure If however the Series 90 software is installed in a different directory the SET command...

Page 56: ...lower case characters can be used for both the keywords and the parameters If any keyword is not found in the file the default value will be used If the file does not exist default values will be use...

Page 57: ...to be shipped they should first be placed in anti static bags SHIPPING AND STORAGE If any of the major components system controller or an expansion cabinet is to be removed from use and placed in sto...

Page 58: ......

Reviews: