background image

 

8

 
 

-   S t e p   N i n e   -

 

 
To “set” the tent, grasp the tent material at the rear of the shelter and pull it downward. Observe the 

front fishing area of the tent lifting accordingly as you pull. When the V-Channel molding is correctly 

installed, the front floor hoop pole will lightly touch the floor. 
 

Start by finding the middle of the V-Channel molding and set it in place on the floor.  From behind the 

unit, pull the midpoint of the tent downward and fold the tent material under the base lip. Press the 
middle of the V-channel molding over the tent material and base lip. Continue pressing outward in both 

directions until you have secured about 2 or 3 feet of the V-Channel molding onto the base.  

 

Having temporarily secured the tent to the base, walk around the shelter.  Re-adjust the molding until you 
have verified the proper front floor hoop pole position (barely touching the floor in front) and also that 

the tent sides and corners are properly proportioned.  

 
Continue applying the molding around the shelter, one direction from center and then the other, pulling 

the material as you go so that surface is relatively wrinkle-free and snug. Use a side-cutters to trim the 

ends of the molding approximately eight (8) inches behind the centerline seam of the shelter on both 
sides. 

 

Secure the molding with the #6 phillips screws.  Evenly space them about every six to ten inches, and 

also put a screw in the center of both corners.  Since there aren’t any predrilled holes, it's advisable to 
use a powered driver for this operation. 

 
 

 
 

 
 

 
 

 
 
 

 
 

 
 

 
 

 
 
 

 
 

 
 

 
 

 
 
 

 
 

 
 

 

 

V-Channel Molding 

13 

15

IMPORTANT:

  Trim the edge 

of the molding so it ends 
approximately 8 inches behind 
the centerline seam on both sides 
of the shelter. 

8”

Summary of Contents for Ice Team 8435

Page 1: ...d and include the original cash register receipt date and purchase price To obtain a return authorization please use one of the following methods Email CustomerService ClamCorp com Preferred Method Ca...

Page 2: ...SCREW 1 4 20 X 0 75 12 9 101081 WASHER 1 4 FLAT 28 10 101082 NUT 1 4 20 THIN NYLOCK 20 11 101208 SCREW 1 4 20 X 1 1 2 8 12 102843 SCREW 14 X 1 75 8 13 101148 SCREW 6 X 0 38 16 14 101314 SNAP PIN 1 4 D...

Page 3: ...3 Install right left canopy brackets item 2 Install seat brackets item 6 Assemble seat item 16 to seat tube weldment item 5...

Page 4: ...of the bolts are even with the ends of the thin lock nuts DO NOT OVERTIGHTEN The poles must slide inside the bracket cutouts Install canopy poles front poles item 3 Install seat assemblies to front an...

Page 5: ...5 Install RPS Rapid Pole Slide push buttons by snapping them in the correct position as shown Install back slip cover item19 Install bottom slip cover item20...

Page 6: ...6 Install hoop poles item 18 Install tow rope item 21 Knot the ends of rope after routing through pre drilled holes in base 21 18 7...

Page 7: ...the tent over the supported hoops then go inside and attach the roof Velcro straps Remove the front hoop pole Place the front hoop pole so that the holes face upward and then feed the length of the p...

Page 8: ...alk around the shelter Re adjust the molding until you have verified the proper front floor hoop pole position barely touching the floor in front and also that the tent sides and corners are properly...

Page 9: ...in the canopy brackets To utilize the shelter at half mast first fully extend all poles Place the pins in the front slot where the hoop poles connect Make sure pins are at the top of the slot The fron...

Page 10: ...e of your shelter NOTE Pulling behind an ATV or snowmobile may result in premature wear of the base Make sure your ice shelter is completely dried out before storing for long periods of time Store you...

Reviews: