6
7
3
Installation
3.1
Unpacking and Setting-up the Device
Lift the device out of the box.
Check device for damage which may have occurred during transport.
Set up device on a level surface.
Check delivery for completeness.
Contents of delivery:
• PCB Separator
• Documentation
• Allen key 2 mm
• optional : Dial Gauge Assy. (Part No. 8970208) to check the alignment of the blades
i
Notice!
Please keep the original packaging in case the device must be returned.
!
Attention!
The device and printing materials will be damaged by moisture and wetness.
Set up the device only in dry locations protected from splash water.
3.2
Earthing Connection
1
Fig. 3
Earthing Connection
!
Attention!
Hazard by electrical charge !
Provide an earthing connection via press stud (1).
3.3
Releasing the Upper Blade Lock
1
2
3
Fig. 4
Releasing the Upper Blade Lock
To avoid possible damage during transportation, the blade carrier (3) is fi xed by a screw (2 / incl. washer) on the
frame (1).
Loosen the screw (2) before operation.
!
Warning!
Risk of injury !
When moving the machine, or when it is to be dispatched elsewhere the screw (2) has to be tighten.