![C-Aire CAMD1 Owner'S Manual Download Page 2](http://html1.mh-extra.com/html/c-aire/camd1/camd1_owners-manual_3075929002.webp)
LL CAMD1 MANUAL // REV: 2 // October 25, 2022
C-Aire
CAMD1 Owner’s Manual
Page
2
of
2
Setting System Pressure
1. Begin with system approximately 5 PSI less than
desired pressure and all ball valves closed (¼
”:
Horizontal,
½”: Vertical).
2.
Turn inlet side ¼” ball valve handle to vertical
position (open).
3. Loosen locking nut on regulator adjustment screw.
4. Turn adjustment screw clockwise to increase
pressure until desired pressure is displayed on
regulator gauge.
a. If
gauge
pressure
exceeds
desired
pressure turn screw counterclockwise until
pressure is 10 PSI below desired pressure
before turning clockwise until desired
pressure is shown on gauge.
5. Tighten locking nut on regulator adjustment screw.
6. Turn all ball valve handles to vertical position to
return to normal operation.
7. Allow system pressure to stabilize and adjust as
necessary.
CAMD1 Parts Diagram
Care and Maintenance
1. Note desired system pressure.
2. Depressurize plumbing prior to loosening any
fittings on the CAMD1.
3. Ensure all ball valves are in the closed position.
a. (¼
”: Horizontal, ½”: Vertical)
4. Slowly remove cap on Y-Strainer, allowing any
remaining pressure to bleed out prior to fully
removing cap.
5. Clean strainer screen and cap.
6. Reinstall strainer screen and cap.
7. Return CAMD1 to normal operation by turning all
ball valve handles to the vertical position.
8. Inspect for leaks with a soapy water solution.
9. Ensure system reaches desired system pressure.
Warranty
Please refer to
warranty information and registration or contact C-Aire
directly at (651) 462-3440.