background image

LL CAMD1 MANUAL // REV: 2 // October 25, 2022   

C-Aire 

CAMD1 Owner’s Manual 

Page 

2

 of 

2

 

Setting System Pressure

 

1.  Begin with system approximately 5 PSI less than 

desired  pressure  and  all  ball  valves  closed  (¼

”: 

Horizontal, 

½”: Vertical). 

2. 

Turn  inlet  side  ¼”  ball  valve  handle  to  vertical 
position (open). 

3.  Loosen locking nut on regulator adjustment screw. 
4.  Turn  adjustment  screw  clockwise  to  increase 

pressure  until  desired  pressure  is  displayed  on 
regulator gauge. 

a.  If 

gauge 

pressure 

exceeds 

desired 

pressure turn screw counterclockwise until 
pressure is 10 PSI below desired pressure 
before  turning  clockwise  until  desired 
pressure is shown on gauge. 

5.  Tighten locking nut on regulator adjustment screw. 
6.  Turn  all  ball  valve  handles  to  vertical  position  to 

return to normal operation. 

7.  Allow  system  pressure  to  stabilize  and  adjust  as 

necessary. 

 

CAMD1 Parts Diagram 

 

Care and Maintenance 

1.  Note desired system pressure. 
2.  Depressurize  plumbing  prior  to  loosening  any 

fittings on the CAMD1.  

3.  Ensure all ball valves are in the closed position. 

a.  (¼

”: Horizontal, ½”: Vertical) 

4.  Slowly  remove  cap  on  Y-Strainer,  allowing  any 

remaining  pressure  to  bleed  out  prior  to  fully 
removing cap. 

5.  Clean strainer screen and cap. 
6.  Reinstall strainer screen and cap. 
7.  Return CAMD1 to normal operation by turning all 

ball valve handles to the vertical position.  

8.  Inspect for leaks with a soapy water solution. 
9.  Ensure system reaches desired system pressure. 

Warranty

 

Please  refer  to 

cairecompressors.com/warranty

  for 

warranty  information  and  registration  or  contact  C-Aire 
directly at (651) 462-3440.

 

Reviews: