BZ PRODUCTS MPPT500 Installation Manual Download Page 2

 
 

 
 

 
 

 

Protect wiring from damage. If wire conduit is not used, install the wire bushings (supplied) to 

protect the wiring from damage. Clearly labeling all wiring with permanent wire markers will simplify 
installation and help prevent wiring errors. Write the wire designations on the MPPT500 wiring diagram. 
Documenting the installation will help troubleshoot any problems in the future. Permanent wire labels are 
available from most electrical parts suppliers. Route wiring as directly as possible to the photovoltaic 
panels and batteries. Take care to follow the wiring diagram exactly. 

 

BATTERY VOLTAGE SELECTION: 

SW-1 on the MPPT500 circuit board selects the battery voltage.  

The switch is marked 12, 24 and 48 corresponding to the battery voltage.  Select the battery voltage by 
depressing the required battery voltage white switch to the right. As shipped SW-1 is set for 12 volt and 
flooded battery.  To change the battery from 12 volts to 24 volts, press SW-1 position 4 (marked 12) to the 
left and press SW-1 position 3 (marked 24) to the right. For 48 volt operation, press SW-1 position 2 
(marked 48) to the right. Position 1 on SW-1 open (as shipped) is set for flooded batteries. For sealed 
batteries, depress position 1 rocker to the closed (right) position. 

 

FOR 12 VOLT INSTALLATIONS USING FLOODED BATTERIES 

NO ADJUSTMENTS ARE REQUIRED. 

 

WIRE SIZING:

 For best operation use properly sized wire. Refer to the wire size chart to determine 

minimum wire size. Wire sizes specified are the minimum required, a larger wire size than specified may 
be used. 

 

WIRE SIZING CHART 

 

 

TOTAL PV 

INPUT  

WATTS 

 

 
 

1-10 FT

 

 
 

11-20 FT

 

 
 

21-30 FT

 

 
 

31-40 FT

 

 
 

41-50 FT

 

 

100 TO 250 

WATTS 

 

 
 

#  10 AWG

 

 
 

#  8 AWG

 

 
 

#  6 AWG

 

 
 

#  4 AWG

 

 
 

#  2 AWG 

 

 

251 TO 500 

WATTS 

 

 
 

#  8 AWG

 

 
 

#  6 AWG

 

 
 

#  4 AWG

 

 
 

#  2 AWG

 

 
 

#  1/0 AWG

 

 

 

 

 

USE CAUTION WHEN CHANGING FUSES 

 

FUSES:

  Separate fuses are required for the solar panel and battery circuits. Use properly rated fuses in all 

circuits. See wiring diagram (last page) for more information.  

 

FUSE RATINGS: 

Properly rated fuses are required in all installations. Refer to the fuse selection chart 

and wiring diagram to determine the proper fuse ratings.  
 

 
 
 
 
 
 
 

 
 

Reviews: