TRANSPORTATION AND STORAGE
ECB16S-B/ECB18S-B
64
ECB16S-B/ECB18S-B
65
OM-ECB16/18S-B2019001-EN
1. Inner mast bottom height adjustment
(1) Tilt the mast to be on the vertical position, and then fully lower the mast.
(2) Loosen the upper nut (that some masts have) and the lower nut.
(3) Screw the middle nut to adjust the chain until it meet the requirement.
(4) Tighten the upper and lower nuts.
CODE
PART NAME
QTY
INFOR-MATION
11
NUT
1
150Nm
12
NUT
1
150Nm
13
NUT
1
150Nm
2. Fork-to-ground clearance adjustment
(1) Tilt the mast to be on the vertical position, and then fully lower the mast.
(2) Loosen the upper nut (that some masts have) and the lower nut.
(3) Screw the middle nut to adjust the chain until it meet the requirement.
(4) Tighten the upper and lower nuts.
CODE
PART NAME
QTY
INFOR-MATION
11
NUT
1
150Nm
11
12
13
12
NUT
1
150Nm
13
NUT
1
150Nm
Mast Cleaning
Take out debris between the roller and the channel of the mast.
。
Mast Clearance Adjustment
1.General Description
A circlip locks the mast roller, bearing, and the dust protection that are installed on the mast or
the carriage stub. The bearing is used to adjust the clearance of the mast and carriage by the
adjusting screw, which is installed on the other side of the stub. Adjusting screw is secured by a
secure pin.
。
2. 2-Stage Mast and Carriage Roller Description
In the 2-stage mast, 2 mast rollers are installed on the top side of the outer mast, 2 mast
rollers are installed on the bottom side of the inner mast, and 6 mast rollers are installed on the
carriage. Being different from others, the upper 2 mast rollers of the carriage are installed by roller
protections and bolts.
3. 3-Stage Mast and Carriage Roller Description
In the 3-stage mast, 2 mast rollers are installed on the top side of the outer mast, 4 mast
rollers are installed on both sides of the middle mast, 2 mast rollers are installed on the bottom
side of the inner mast, and 6 mast rollers are installed on the carriage. Being different from others,
the upper 2 mast rollers of the carriage are installed by roller protections and bolts.
。
4. Carriage and Mast Clearance Adjustment
(1) Lift the mast to expose the position of the adjusting screw.
(2) Bend the secure pin to expose the adjusting screw.
(3) Use the screw to adjust the clearance.
(4) After adjustment, bend the secure pin to secure the adjustment screw.
82
83
86
84
85
81