C
B
A
E
F
D
1× = 1 °KH
10 ml
A
D
B
E
C
F
2
1
3
Fig. 1
Content
1. Scope of Delivery ...........................................................................................................3
1.1 Installation Set .............................................................................................................3
1.2 Replacement Cartridge ................................................................................................3
2. Technical Data ................................................................................................................3
2.1 Dimensions and Weights .............................................................................................3
2.2 Operation Conditions ..................................................................................................4
3. General Information .......................................................................................................4
3.2 Symbol Explanation .....................................................................................................4
3.2 Information about this Installation and Operation Manual.............................................4
3.3 Limited Warranty and Liability ......................................................................................4
3.4 Responsibility of the Costumer ....................................................................................5
4. Filter Function ................................................................................................................5
4.1 Assigned Use ..............................................................................................................5
4.2 Construction ...............................................................................................................5
5. Operation and Safety Instructions ...............................................................................6
5.1 Intended Use ...............................................................................................................6
5.2 Qualified Staff ..............................................................................................................7
5.3 Operation after a Shut Down .......................................................................................7
5.4 Replacement Interval ...................................................................................................7
5.5 Disposal .......................................................................................................................7
6. Filter installation .............................................................................................................7
6.1 Water Quality ...............................................................................................................7
6.2 Pressure ......................................................................................................................8
6.3 Material Selection ........................................................................................................8
6.4 Unpacking the Filter .....................................................................................................8
6.5 Mounting of the Filter Head and Wall bracket ..............................................................8
6.5.1 Mounting the Wall bracket ..................................................................................8
6.5.2 Mounting the Filter Head .....................................................................................9
6.6 Installing a Water Meter ...............................................................................................9
6.7 Determination of the Filter Capacity and the Blend Setting ..........................................9
6.8 Filter Cartridge Installation ..........................................................................................10
6.8.1 Rinse/Purge with the Device .............................................................................10
6.8.2 Rinse/Purge with a Rinsing Tap ........................................................................10
6.8.3 Rinse/Purge by Using the Outlet or Water Disposal Hose .................................11
6.9 Filter Cartridge Replacement .....................................................................................11
7. Service and Maintenance ...........................................................................................11
8. Trouble Shooting ..........................................................................................................12
9. Order Numbers .............................................................................................................12
10. Capacities and Blend Setting .....................................................................................13
10.1 Application - Capacity .............................................................................................13
10.1.1 Hot Beverage Machines with steam generator .............................................13
10.1.2 Cold and Hot Beverage Machines without steam generator
[max. temperature 203°F(95°C)] ...................................................................14
10.1.3 Combi-Steamer/Oven, Blend “1” ..................................................................15
10.1.4 Combi-Steamer/Oven, Blend “0” ..................................................................16
10.2 Chlorine Reduction ..................................................................................................16
10.3 Capacity based on Chlorine Reduction ...................................................................16
5351_EEBA Vizion HRS-100 + HRS-200_UMSCHLAG.indd 2
05.12.13 09:11