BWT SF 10 Litre Timed Manual Download Page 2

STARTING THE INSTALLATION – ALL MODELS

Before commencing the installation, ascertain that the water pressure is not too low or high. Optimum operating pressure is 1.75 
to 4 Bar (25 to 60 p.s.i.). If daytime pressure exceeds 4 Bar (60 p.s.i.), then a pressure limiting valve should be installed. These are
available from your supplier and should be located as shown in Fig. 1. Pressure can be determined by applying a gauge to an 
outside tap or single pillar tap or by contacting your local Water Board. If water splashes out over the sink when the cold tap 
is turned fully on, it is a good indication of high pressure.

DRAIN THE RISING MAIN

Turn off the existing cold mains supply stopcock and drain down any water in the pipe via the “drain off cock” or kitchen cold
tap. To allow air to enter the main via the ballvalve in the loft tank, run a small amount of water from the cold tap in the 
bathroom. If all your cold supply connections are off the rising main, open a tap at the highest point.

INSTALLING THE BY-PASS SET

Cut the rising main and install the inlet, outlet and by-pass valves as shown in Fig.1. Install the non return check valve and 
connect hard water supply to kitchen drinking tap and/or outside garden supply (if required). Fit the pressure limiting valve 
(if applicable) prior to the hard water inlet to the water softener.

Turn the inlet and outlet valves to closed (handle pointing across water flow). Turn the by-pass valve to open (handle pointing
with the water flow).

Ensure the “drain off cock” is closed and turn back on the existing stopcock. This will allow hard water to again enter the system.

CONNECTING INLET/OUTLET HOSES

MODEL SF 10 Litre Timed

Fit the two 

3

4

” nylon nipples into “

” inlet and “

”outlet sockets. Use a suitable thread

sealer such as PTFE tape.

All MODELS

From the inlet valve connect a hose to the inlet port marked “

” on the 

water softener control valve (Fig. 1). Check that the rubber washers (Fig. 2) 
are in place and hand tighten nut plus half turn with a spanner. Connect 
outlet hose from outlet valve to water softener in the same manner.

Your water softener comes complete with a basic 10mm flexible trade installation kit (see detail sheet with kit). Alternatively you
can disregard the hoses and “hard plumb” the connections in 15mm or 22mm copper tube.

Unvented/direct mains fed plumbing and hot water systems: For maximum flow rates disregard the inlet and outlet hoses, valves
and non-return check valve. “Hard plumb” using 22mm copper tube and fittings. A 22mm non-return check valve will also be
required. It must be UK Water Fittings Byelaw Scheme (W.F.B.S.) listed.

The following are available from Culligan or your retailer:

22mm non-return valve.

Pressure limiting valve 3.5 Bar (50 p.s.i.) for high pressure areas.

Hardness measuring kit: For accurate testing.

Drinking water tap: For hard water drinking point.

Drinking water filter kits.

12.5mm inlet/outlet hoses.

LOW-HEIGHT – RESTRICTIONS (under low sinks etc)

If you are in a situation where height is a problem, it is possible to mark out the shape of the water softener cabinet and cut out
the wooden plinth. Allow the “Cut-Out” to fall through the hole to act as a smooth base for the water softener to sit on. The
gap between the water softener and the cut out can be filled with a plastic edging strip.

PRE-INSTALLATION

INSTALLATION

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

FIG. 2

Rubber Washer

BWT 

Summary of Contents for SF 10 Litre Timed

Page 1: ...in the loft the following instructions should be strictly adhered to The water softener should be installed within a container of not less than 113 65 Litres 25 gallons capacity to which there shall...

Page 2: ...water to again enter the system CONNECTING INLET OUTLET HOSES MODEL SF 10 Litre Timed Fit the two 3 4 nylon nipples into inlet and outlet sockets Use a suitable thread sealer such as PTFE tape All MOD...

Page 3: ...discharging into a stand pipe always leave an air gap between water level and hose outlet Secure the hose at stand pipe to prevent kinking and accidental removal or blow out of the hose Using the plas...

Page 4: ...t to Sections 12 COMMISSIONING THE WATER SOFTENER ALL MODELS It will be necessary to ascertain the hardness of your water This information is available from your local water supply company Alternative...

Page 5: ...een set at the factory Unless you need to alter the hardness for your area it is set to 17 GPG Grains Per Gallon or 290 p p m no further adjustment should be made If for any reason you should wish to...

Page 6: ...why we offer a range of unique service programmes carried out by the manufacturers own national service team Telephone for details on 01376 334 200 SALT Salt is essential to make the water softener wo...

Page 7: ...system please call us on our helpline USEFUL NOTES For manual regeneration see Adjustment of timer section 10 4 or 13 6 For minimum and maximum salt levels see section 9 paragraph 8 or section 12 para...

Page 8: ...nge without prior notice E OE Please retain this manual Culligan International UK Limited Culligan House Coronation Road High Wycombe Buckinghamshire HP12 3SU United Kingdom Tel 01376 334 200 Fax 0137...

Reviews: