Buyers EZ Gate 5201000 Installation Instructions Manual Download Page 1

Installation Instructions

5201000 

 EZ Gate

 by Buyers: 

Trailer Tailgate Lift Assist

Patent #6,183,031

9.

 Mounting the other end of the Spring Assembly

 

a.

 Close and LOCK your tailgate in the “UP" or 

transport position.

 

b.

 If you have a 48" tailgate, measure down 15" from the 

high side and drill a 1/2" hole.

 

c.

 If you have a 60" tailgate, measure down 24" from the 

high side and drill a 1/2" hole.

 

d.

 If you have a 72" tailgate, measure down 34" from 

the high side and drill a 1/2" hole.

10.

 Install the loose Eyebolt in the tailgate using two 

washers and a locknut.

11.

 Insert the Bottom Roller Wheel into the Roller 

Assembly using a 1/4" bolt, two washers, and a locknut.

12.

 First, attach the Snap Hook to the end of the chain and 

then carefully stretch the spring assembly until it can 
be attached to the eyebolt in the tailgate. 

 a.

 Once connected, fully lower the tailgate and ensure 

that it lays on the ground and does not lift on its own.

13.

 While the tailgate is on the ground, install the Top 

Roller Wheel.

14.

 Lift and lower the tailgate to get a feel for how it 

operates with the EZ Gate installed. Moving the Snap 
Hook to different chain links can vary the tension if 
desired. 

WARNING: Adjustment must ONLY be done 

when there is NO tension on the Roller Wheels. To 
achieve this, fully lower the tailgate, remove top roller 
wheel, raise tailgate, make the adjustment, lower 
the tailgate, reinstall the top roller wheel and verify 
adjustment is acceptable.

9049 Tyler Blvd. • Mentor, Ohio 44060

Phone (440) 974-8888 • Fax 800-841-8003

Email: [email protected] • buyersproducts.com

1.

 Mark the mounting locations

 

a.

 Measure 90" from the rear of the trailer top rail and 

drill one hole 1/2" in the center of the top rail. Every 
hole from this point on will be towards the rear of the 
trailer.

 

b.

 Measure back 6" from the 1/2" hole and drill one 5/16" 

hole centered in the top rail.

 

c.

 Measure back 30" from the 5/16" hole and drill 

another 5/16" hole; centered in the top rail.

 

d.

 Measure back again 30" from the second hole and 

drill a third and final 5/16" hole; centered in the top rail.

2.

 Mount the Housing Clamps to the three 5/16" holes. Be 

sure that square opening is toward the center of the 
trailer. Secure with a bolt and washer mounted down 
through each Clamp and rail then fasten with a lock 
nut.

3.

 Spread the Clamps wide enough to set the housing in 

place

4.

 Mount the Roller Bracket

 

a.

 Place the Roller Bracket flush with the rear of the top 

rail (short leg with single hole should face rear).

 

b.

 Use the holes in the bottom bracket to mark drilling 

positions in the rail; drill 5/16" holes there.

 

c.

 Mounted the Roller Bracket with bolts and washers 

so the locknuts are underneath the rails.

 (NOTE: 

Longer bolts are provided for tubular side rails. If your 

trailer requires special lengths, you can purchase 
5/16"-18, Grade 5 bolts of the required length from a 
local hardware store)

5.

 Mount the Spring Assembly to the side rail by bolting 

the eyebolt end to the first hole you drilled (1/2"). 

(NOTE: The open end of the eyebolt must face toward 
the front of the trailer.)

6.

 Place the Spring Housing Assembly over the Spring 

Assembly until it is up against the eyebolt. 

(NOTE: The 

end with the plastic insert must be toward the rear of 

the trailer.)

7.

 Place the Spring Housing Tube over the Spring 

Assembly and against the Spring Housing Assembly so 
that the plastic insert is fully inside.

8.

 Make certain that the connection of the Spring Housing 

Assembly and Spring Housing Tube is at the center 
clamp and tighten all three clamps around the housing.

Reviews: