(1) Insert the Steel Wire head of control cable into the small hole on Gauge and Lever
Assembly. (2)Release two bolts M5x10 and lock nuts on Press Plate. (3) Put the Plastic Tube into the slot of Press Plate. (4) Tighten two bolts M5x10 and lock nuts again. (5). Insert R Pin.