![Butler NAV51.15 Instruction Manual Download Page 23](http://html.mh-extra.com/html/butler/nav51-15/nav51-15_instruction-manual_2835859023.webp)
INSTRUCTION, USE AND
MAINTENANCE MANUAL
GB
Page 23 of 96
TOOL EXTRACTION
THE FOLLOWING OPERATIONS
MUST BE CARRIED OUT WITH
THE TOOLS HEAD IN “OFF- WORK”
POSITION.
1) Push the lever (
Fig. 22 ref. 1
) towards the tool arm
and place the head (
Fig. 22 ref. 2
) at 90° compared
to the work position.
2) Lift the head manually until the pin (
Fig. 23 ref. 1
)
fits automatically.
3) Now the head (
Fig. 23 ref. 2
) stays up, allowing
easily the rotation operations described before.
90°
2
1
Fig. 22
2
1
Fig. 23
TOOL INTRODUCTION
1) Push the lever (
Fig. 24 ref. 1
) towards the tool arm
and place the head (
Fig. 24 ref. 2
) at 90° compared
to the work position.
2) Pulling the check pin (
Fig. 25 ref. 1
) toward the
external, the headstock (
Fig. 25 ref. 2
) inserts in
its seat.
DURING THIS OPERATION, WITH
THE HAND LEFT FREE, MOVE
THE HEAD (FIG. 24 REF. 2) DOWN-
WARDS.
3) At this point, it is possible to rotate the head (
Fig. 25
ref. 2
) as described before.
PAY ATTENTION NOT TO SQUASH
THE HANDS BETWEEN THE TOOL
SUPPORT AND THE ARM!
90°
1
2
Fig. 24
1
2
Fig. 25
7522-M004-1_B
NAV51.15 - NAV51T.15 - NAV51.15N