8
ASSEMBLY PROCEDURES
When Blowing (continued)
Fitting The Handle
3.
Rotate the nozzle tube clockwise locking it into place. (See Fig. 2)
4.
Remove the tube locking screw. (See Fig. 3._
5.
Push the assembled blower tube over the discharge port and locking pin.
6.
Rotate the tube clockwise to lock it into position. (See Fig. 4).
7.
Retighten the locking screw.
When Vacuuming
1. Unscrew locking wing-nut and store safely until closing the inlet grill. (See Fig. 5).
2. Rotate the two vacuum tubes together then open grill and attach onto machine.Rotate tube clockwise into locking
position (See Fig. 6).
3. Open zupper and pass narrow end of exhale tube through hole at opposite end. Pull narrow end of tube out of hole until
it is held firmly in place at wider end. (See Fig. 7).
4. Attach exhale tube to the machine and twist in place then tighten the securing screw. (See Fig. 8).
11
3. Rotate the nozzle tube clockwise locking it into place.
4.
Remove the tube locking screw.
5. Push the assembled blower tube over the discharge port and locking
pin.
6. Rotate the tube clockwise to lock it into position.
7. Retighten the locking screw.
When Inhaling
1. Unscrew locking wing-nut and store
safely until closing the inlet grill
2. Rotate the two inhale tubes together
then open grill and attach onto
machine.Rotate tube clockwise into
locking position.
3.Open zupper and pass narrow end of
exhale tube through hole at opposite end.
Pull narrow end of tube out of hole until
it is held firmly in place at wider end.
11
3. Rotate the nozzle tube clockwise locking it into place.
4.
Remove the tube locking screw.
5. Push the assembled blower tube over the discharge port and locking
pin.
6. Rotate the tube clockwise to lock it into position.
7. Retighten the locking screw.
When Inhaling
1. Unscrew locking wing-nut and store
safely until closing the inlet grill
2. Rotate the two inhale tubes together
then open grill and attach onto
machine.Rotate tube clockwise into
locking position.
3.Open zupper and pass narrow end of
exhale tube through hole at opposite end.
Pull narrow end of tube out of hole until
it is held firmly in place at wider end.
11
3. Rotate the nozzle tube clockwise locking it into place.
4.
Remove the tube locking screw.
5. Push the assembled blower tube over the discharge port and locking
pin.
6. Rotate the tube clockwise to lock it into position.
7. Retighten the locking screw.
When Inhaling
1. Unscrew locking wing-nut and store
safely until closing the inlet grill
2. Rotate the two inhale tubes together
then open grill and attach onto
machine.Rotate tube clockwise into
locking position.
3.Open zupper and pass narrow end of
exhale tube through hole at opposite end.
Pull narrow end of tube out of hole until
it is held firmly in place at wider end.
12
4. Attach exhale tube to the machine
and twist in place then tighten the
securing screw.
Important
:
Use good quality 4-stroke engine oil.
Use fresh unleaded petrol. Keep fuel out of the reach of children.
Filling the fuel tank
Warning:
Always shut off the engine before fuelling. Never add fuel to a
machine with a running or hot engine. Move at least 9m away from the
re-fuelling site before starting engine. Do not smoke when re-fuelling or
operating the blower.
Warning
:
Use pure fuel
,
do not use fuel that is more than 2-3 months old.
Empty the tank during longer breaks and fill it up again as soon as you
wish to use the blower again.
Note.
It is normal for smoke to be emitted frim a new engine during and
after first use.
1. Place the blower upright on the ground or on a sturdy bench
and wipe
any debris from around the fuel cap.
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Summary of Contents for BRV2601
Page 1: ...1 BLOWER VAC BRV2601 OPERATOR S MANUAL ...
Page 18: ...18 NOTES ...
Page 19: ...19 NOTES ...