Mounting steps;
1- Drill the required holes in accordance with the distances specified in Figure A4.
(Page
5
)
2- Drive
2
x Ø8 mm threaded inserts and 2x Ø7 threaded inserts into the wall.
3- Drive
4
x50
mm
screws into the threaded insert making sure that the spacing between the wall and
the screw head is 2-4 mm in Figure A5-1 and Figure A5-2
4- Lift the product, slide the screw head into the large hole on the motor connection plate & wall
mounting plate and slightly push the product against the wall and downwards, make sure that screw
heads are properly inserted into the hole.
5- Check the steps you applied and continue with the flue assembly.
1- Ø8 mm threaded insert
2- 4x50
mm
screw
3- Motor connection plate & wall mounting plate
4- Body
Figure
A5
1
2
3
4
Figure A
5
-1
Figure A
5
-2
Installation instructions
Regulations and standards
Before you start please read instructions carefully. All installations, service and repair work must
be in accordance with local standards and regulations.
In the UK the regulations and standards are as follows:
1. Building regulations.
2. The current I.E.E. wiring regulations.
3. Electricity at work regulations.
4. Installation and servicing instructions for this appliance.
6