
8 | Maintenance
20 | 36
Instruction Manual PANDA WZ 0250-0500 B_EN_en
8.1
Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The intervals
given below are considered as starting values which should be shortened or extended as
appropriate. Particularly harsh applications or heavy duty operation, such as high dust loads in the
environment or in the process gas, other contamination or ingress of process material, can make it
necessary to shorten the maintenance intervals significantly.
8.1.1
With "YLC 250 B" Oil
Interval
Maintenance work
Monthly
●
Check the oil level, see
●
Check the machine for oil leaks - in case of leaks have the
machine repaired (contact Busch).
Yearly
●
Perform an oil inspection; change it if the oil has changed
its initial color, see
Every 16000 hours or after 4
years
●
Change the oil of the gear and bearing housings (both
sides)
●
Clean the magnetic plugs (MP)
●
Have a major overhaul on the machine (contact Busch).
8.1.2
With "VSC 100" Oil
Interval
Maintenance work
Monthly
●
Check the oil level, see
●
Check the machine for oil leaks - in case of leaks have the
machine repaired (contact Busch).
After the first 500 hours
●
Change the oil of the gear and bearing housings (both
sides), see
Every 6 months
●
Perform an oil inspection; change it if the oil has changed
its initial color, see
Every 5000 hours or after 1 year
●
Change the oil of the gear and bearing housings (both
sides)
●
Clean the magnetic plugs (MP)
8.2
Oil Level Inspection
●
Shut down the machine.
●
When the machine is stopped, wait 1 minute before checking the oil level.
MAX
MIN
MAX
MIN
MAX
MIN
●