
7
A
. INSPECT SHIPMENT carefully for any signs of
damage.
1. ALL EQUIPMENT is carefully manufactured,
inspected and packed. Our responsibility ceases
upon delivery of the crated boiler to the carrier in
good condition.
2. ANY CLAIMS for damage or shortage of shipment
must filed immediately against the carrier by the
consignee. No claims for variances from, or
shortage in orders, will be allowed by the manufac-
turer unless presented within sixty (60) days after
receipt of goods.
B
. LOCATE BOILER in front of final position before
removing crate.
1. LOCATE so that smoke pipe connection to chim-
ney will be short and direct. BOILER IS NOT
SUITABLE FOR INSTALLATION ON COMBUS-
TIBLE FLOOR unless combustible floor shield,
I. Pre-Installation
supplied by Burnham, is used. DO NOT install on
carpeting.
2. FOR BASEMENT INSTALLATION, provide a
solid base, such as concrete, if floor is not level, or
if water may be encountered on floor around boiler.
3. PROVIDE SERVICE CLEARANCE of at least 48”
from the front of the jacket for servicing of burner
and removal of tankless heater.
For minimum clearances to combustible materials. See
Figure 2.
Figure 2: Minimum Clearances to Combustible Materials
NOTE:
1.
Listed clearances comply with American National Standard ANSI/NFPA 31, Installation of Oil Burning Equipment.
2.
RSA boilers can be installed in rooms with clearances from combustible material as listed above. Listed clearances can not
be reduced for alcove or closet installations.
3.
For reduced clearances to combustible material, protection must be provided as described in the above ANSI/NFPA 31
standard.
Summary of Contents for BOILERS
Page 1: ...1 Price 3 00 INSTALLATION OPERATING AND SERVICE INSTRUCTIONS FOR RSA BOILERS ...
Page 10: ...10 Figure 5 Burner Mounting ...
Page 11: ...11 Figure 6 RSA Jacket Assembly ...
Page 14: ...14 Figure 8 Recommended Boiler Piping for Circulator Zoned Heating Systems ...
Page 15: ...15 Figure 9 Boiler Piping for Zone Valve Zoned Heating Systems ...
Page 22: ...22 Figure 16 Circulator Zoned Wiring for Honeywell R8888 ...
Page 23: ...23 Figure 17 Zone Valve Zoned Wiring for R8889 ...
Page 24: ...24 Figure 18 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Page 26: ...26 Figure 19 Circulator Zoning with EC5000 Wiring Schematic ...
Page 27: ...27 Figure 20 Zone Valve Zoned with EC5000 Wiring Schematic ...
Page 43: ...43 SERVICE SCHEDULE DATE SERVICE PERFORMED ...
Page 45: ...45 Ordering Information for Quality Replacement Parts Figure 29 BECKETT AFG MODEL BURNER ...
Page 48: ...48 ...