SPECIAL APPLICATIONS
BASE-RAY
®
INSTALLED ON THREE WALLS OF ROOM
–
When BASE-RAY is installed on three walls, expansion
noises are sometimes created by the middle assembly when
rigid piping is used to connect all three assemblies together.
Flexibility can be gained by connecting two of the adjoining
assemblies with a
À
exible connector or swing joint such as
illustrated.
INSTALLATION WITH BURNHAM RADIANT OR
SLENDERIZED RADIATORS
– Since a BASE-RAY
installation is made in much the same manner as any other
radiator system, BURNHAM RADIANT OR SLENDER-
IZED RADIATORS may be used in a BASE-RAY Radiant
Baseboard System.
TWO-TIER INSTALLATION
– Where wall space is limited,
BASE-RAY may be installed in tiers. Both sections may be
upright or lower section inverted as illustrated. Legs on end
sections are cut off to enhance appearance.
RATING CORRECTION FACTOR
– If BASE-RAY is
installed in tiers in accordance with the illustrations, each tier
will have a rating of .91 times the rating shown in the Tables
on pages 2 and 3.
POSSIBLE PIPING ARRANGEMENTS
TWO-TIER BASE-RAY FORCED CIRCULATION HOT WATER SYSTEMS