
82
IO-Link - Design
14.5.4
Electrical installation – IO-Link
For the versions with cable glands:
→
Open the housing (compare chapter “8 Opening and Closing the Housing” on page
) so that the
electronic module is visible as shown below (“Fig. 36”).
→
Connect the different wires of the cable (unshielded 3- or 5-line standard lines) to the connection terminals on
the left side as described in chapter
“14.5.5”. The assignment conforms to the IO-Link specification.
Solenoid valve connection
with status LED for Valve V1
Connection of the exter-
nal proximity switch
Micro-USB port for
service purposes (büS)
Teach buttons T1-3
Solenoid valve connec-
tions with status LED
for Valves V2, V3
Port for Power 1
Ports for C/Q and
Power 2
(2L+, 2M for port class B)
Fig. 36:
Electronic module IO-Link (in the example: port class B)
For the multi-pole connection variants:
No internal cabling work is required for any of the IO-Link versions with multi-pole connection which makes
installation and start-up on site considerably easier and quicker, reducing the risk of leaks.
The control head features a multi-pole circular plug (M12 x 1-, 4- or 5-pole, male) to a cable 15 cm in length. The
assignment corresponds to the IO-Link specification, or see also the next chapter “14.5.5”).
english
Control Head Type 8681
Summary of Contents for 8681
Page 165: ...165 english Control Head Type 8681 ...
Page 166: ...www burkert com ...