Burger & Brown SMARTFLOW SWAP SPV8 Installation And Operating Instructions Download Page 4

4

SWAP Valve Instructions

burger & brown engineering, inc. 

www.smartflow-usa.com

Troubleshooting

Symptom

Corrective Action

Air or water does not flow through the system

• 

Verify check valve direction

• 

Check that the valve handle is in the correct position

Water leaks from the valve while in operation

• 

Replace O-Rings (Contact the factory for repair or field replacement 

procedure)

Mold does not evacuate completely

• 

Check air pressure (80 to 125 psi required)

Replacement/Additional Parts

Description 

SPV8 (1-inch) 

SPV16 (2-inch)

O-ring Set

 .........................................................

PVOSET-100A 

PVOSET-200A

Valve Handle Knob

 ..........................................

PVKB-100-A 

PVKB-100-A

Mounting Brackets (2 required per valve)

 .......

PVB-100-A 

PVB-100-A

Air Check Valve 3/8"

 .......................................

PVCV-3-A 

PVCV-3-A

Return Check valve

 ..........................................

PVCV-100-A 

PVCV-200-A

Manual Vent

 .....................................................S15-2532-A S15-2532-A

Summary of Contents for SMARTFLOW SWAP SPV8

Page 1: ...hange The VENT position is selected to bleed off trapped pressure and drain residual water before a mold change An optional spring loaded locking pin is available to prevent accidental movement of the valve handle Assembly as required 1 Apply thread locking compound Loctite 638 or equivalent to threaded end of valve handle Screw valve handle into the center disk threaded hole See figure 1 2 Instal...

Page 2: ...et ahead of the SWAP Valve In closed loop systems air separator installation is recommended to bleed off residual air introduced by the SWAP Valve See figure 2 Supply Water In Air In Supply Water Return Check Valve Included Return Manifold Supply Manifold Injection Mold Vent SWAP Valve Optional Air Check Valve not included Taco Air Separator Figure 2 Recommended Closed Loop Installation with Air S...

Page 3: ... operating configuration 5 Selecter WATER after the new mold is installed and the cooling water connections are secure For Normal Processing Select WATER Cooling Water is available to the Supply manifold Purge Air is blocked To Evacuate Cooling Water See Note Below Select PURGE Purge Air is available to the Supply manifold Cooling Water is blocked To Bleed Off Trapped Pressure and Drain Residual W...

Page 4: ...e in operation Replace O Rings Contact the factory for repair or field replacement procedure Mold does not evacuate completely Check air pressure 80 to 125 psi required Replacement Additional Parts Description SPV8 1 inch SPV16 2 inch O ring Set PVOSET 100A PVOSET 200A Valve Handle Knob PVKB 100 A PVKB 100 A Mounting Brackets 2 required per valve PVB 100 A PVB 100 A Air Check Valve 3 8 PVCV 3 A PV...

Reviews: