![Burger & Brown SMARTFLOW SWAP SPV8 Installation And Operating Instructions Download Page 4](http://html.mh-extra.com/html/burger-and-brown/smartflow-swap-spv8/smartflow-swap-spv8_installation-and-operating-instructions_2831800004.webp)
4
SWAP Valve Instructions
burger & brown engineering, inc.
www.smartflow-usa.com
Troubleshooting
Symptom
Corrective Action
Air or water does not flow through the system
•
Verify check valve direction
•
Check that the valve handle is in the correct position
Water leaks from the valve while in operation
•
Replace O-Rings (Contact the factory for repair or field replacement
procedure)
Mold does not evacuate completely
•
Check air pressure (80 to 125 psi required)
Replacement/Additional Parts
Description
SPV8 (1-inch)
SPV16 (2-inch)
O-ring Set
.........................................................
PVOSET-100A
PVOSET-200A
Valve Handle Knob
..........................................
PVKB-100-A
PVKB-100-A
Mounting Brackets (2 required per valve)
.......
PVB-100-A
PVB-100-A
Air Check Valve 3/8"
.......................................
PVCV-3-A
PVCV-3-A
Return Check valve
..........................................
PVCV-100-A
PVCV-200-A
Manual Vent
.....................................................S15-2532-A S15-2532-A