![Burger & Brown SMARTFLOW SWAP SPV8 Installation And Operating Instructions Download Page 1](http://html.mh-extra.com/html/burger-and-brown/smartflow-swap-spv8/smartflow-swap-spv8_installation-and-operating-instructions_2831800001.webp)
Form #SF-122 (11.20)
4500 E 142nd Street • Grandview, MO 64030
Tel. (816) 878-6675 • www.smartflow-usa.com
SWAP
®
V
AlVe
Installation and Operating Instructions
Applies to: SPV8 and SPV16
General
The Smartflow SWAP Valve is a simple, manually
selectable device that supplies cooling water to the mold
during processing, or air to purge the water from the
mold before a mold change.
The SWAP Valve has three positions: WATER, PURGE
and VENT. The WATER position is selected for normal
processing. The PURGE position is selected to evacuate
the water before mold change. The VENT position is
selected to bleed-off trapped pressure and drain residual
water before a mold change.
An optional spring-loaded locking pin is available to
prevent accidental movement of the valve handle.
Assembly (as required)
1.
Apply thread locking compound (Loctite 638 or
equivalent) to threaded end of valve handle. Screw
valve handle into the center disk threaded hole. See
figure 1.
2.
Install mounting brackets (included) into desired
hole locations using included mounting screws.
3.
Thread manual vent into the hole as shown in
figure 1. (No additional thread sealant is required.)
Mounting
Bracket
Water Inlet
Valve Handle
Center Disk
Threaded
Hole
Air/Water
Outlet
(back side)
Optional
Locking Pin
3/8"NPT(F)
Air Inlet
Manual Vent
Figure 1