36 | English
BURGcam BULLET 304
BURGcam BULLET 304
English | 37
Installation
Preparations
Checkliste:
1
Power supply is available at installation spot
2
For WIFI operation: WIFI signal strength is good
enough for high quality video streaming.
Maybe a repeater is required.
3
No power cable or water pipes can be damaged
during installation
4
There are no obstacles in view field of the camera at
desired location.
5
For WIFI operation: WIFI password is ready to hand
6
5 Ghz Frequenzband des Dual-Band Routers deak-
tiviert
7
Smartphone mit der WIFI SSID Verbunden
in welches die Kamera eingerichtet werden soll.
Summary of Contents for BURGcam BULLET 304
Page 2: ...2 BURGcam BULLET 304 BURGcam BULLET 304...
Page 7: ...BURGcam BULLET 304 Deutsch 7 Anschl sse Anzeigen und Bedientasten...
Page 15: ...BURGcam BULLET 304 Deutsch 15 Abb 1 Abb 4 Abb 5 Abb 2 Abb 3...
Page 35: ...BURGcam BULLET 304 English 35 Connections indicators and buttons...
Page 41: ...BURGcam BULLET 304 English 41 Fig 1...
Page 43: ...BURGcam BULLET 304 English 43 Fig 1 Fig 4 Fig 5 Fig 2 Fig 3...
Page 62: ...62 English BURGcam BULLET 304 Note...