FACTORY SET VOLTAGE 115 V
TO CHANGE THE VOLTAGE :
Before changing the
voltage connection:
A) Ensure the power to
the pump is disconnected.
B) Open motor junction box cover.
C) Please select the up knob
position for 115V or down
knob position for 230V.
D) Connect to appropriate voltage.
E) Close motor junction box.
Your pump has been carefully packaged at the
factory to prevent damage during shipping.
However, occasional damage may occur due
to rough handling.
Carefully inspect your
pump
for damages that could cause failures.
Report any damage to your carrier or your point
of purchase.
INSTALLATION
INSTRUCTIONS
JET PUMPS
MODELS
506121S
(VERSION W 2015)
AND OTHER PRODUCTS
506127S, 506128S
506131S, etc.
Please read these
instructions
carefully.
Failure
to comply to
instructions and
designed
operation of
this system,
may
void
the warranty.
© 2018 BURCAM Printed in Canada 506662
Discharge connection
PRIMING PROCESS
Follow all these inside step by step instructions to install your pump. Use teflon tape on
all threads. (1) Fill the suction line with water and connect it to the suction inlet.
(2) Remove the priming plug and fill the pump body with water. (3) Screw the plug to the
priming inlet. (4) Turn the power on. The pump should deliver water to the plumbing line
within 30 seconds. If not, unplug the pump and repeat the process at step 2.
2-3
4
Suction connection
1
2190 Dagenais Blvd. West
Laval (Quebec)
Canada
H7L 5X9
Tel. : 514.337.4415
Fax : 514.337.4029
see us at
www.burcam.com