Page 5
PLUMBING REQUIREMENTS (cont.)
1. Remove the shipping cap from the bulkhead fitting on the rear of the brewer.
2. Attach the flare fitting from the short piece of tubing on the strainer/flow control (supplied) to the water inlet
fitting at the rear of the brewer.
3. Flush the water line and securely attach it to the flare fitting on the strainer/flow control.
4. Turn on the water supply.
INITIAL SET-UP
CAUTION -
The brewer must be disconnected from the power source throughout the initial set-up, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails.
2. Place an empty container of at least 4 gal. capacity under the funnel.
3. Connect the brewer to the power source.
4. Place the "ON/OFF" switch in the "ON" position and momentarily press the "START" switch.
5. Water will flow into the tank and dispenser for approximately three and one-half minutes. Empty the dis-
penser when the first cycle stops and press the "START" switch again. Empty the dispenser when the second
cycle stops and press the "START" switch once more. During the third cycle, the tank will fill to its capacity
and the excess will flow from the brew funnel into the dispenser. Empty the dispenser when this third cycle
stops.
6. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature.
7. Place the "ON/OFF" switch in the "ON" position then momentarily press and release the "START" switch.
8. Allow the cycle to finish and measure the amount of water in the container. It should be 396 ounces
±
2. Refer
to
Adjustments & Optional Settings to adjust the water volume, if needed..
The brewer is now ready for use in accordance with the
Tea Brewing instructions.
P1804
29460 082300
Summary of Contents for TU3Q-EZ
Page 22: ...Page 22 29460 082300...