Bunn SINGLE GPR DBC-DV Installation & Operating Manual Download Page 8

Page 8

SET READY - Range: 185˚F (85˚C) to 203˚F (95˚C)

 

This function allows the operator to set the minimum temperature allowable to start a brew cycle. The range 

can be from 185˚F (85˚C) to within 2˚F (-1.7°C) of the SET TEMP. The water must be at the SET READY tempera-

ture or higher for the display to indicate READY TO BREW. If brew lockout is enabled, the brewing process will 

not start below this READY temperature.

NOTE: The upper limit for SET READY temperature is 2˚F (-1.7°C) less than the water temperature (SET TEMP) 

setting.

Procedure to set ready temperature:

1.  Press and hold upper right hidden switch until the display reads UNITS. Release switch.  Press and release 

upper right hidden switch until the display reads SET READY.

2.  To adjust the ready temperature, press the (-) button to decrease, or (+) to increase the ready temperature.

3.  When finished, press and release DONE to save the new setting, exit the SET READY function and advance 

to the next function screen, REFILL. Another alternative is to press and release either ON/OFF switch located 

on the front switch panel to exit the SET READY function and return to the MAIN SCREEN.

COFFEE BREWING

1.  Select the desired batch size on the grinder.  It is not necessary to select a size on the brewer.

2.  Insert a BUNN filter into the funnel.

3.  Grind or pour the proper amount of fresh ground coffee into the filter and level the grounds by gently shaking.

4.  Slide the funnel into the funnel rails. If the grounds are not obtained through a grinder compatible with a 

Smart Funnel, a batch size must be chosen on the brewer.

5.  Place an empty server under the funnel.

6.  The ENABLE BREW switch must be ON. Momentarily press and release the BREW switch.  If the brewer has 

the funnel lock option and if it is activated, once a brew cycle has been started the funnel is locked in place. 

There may be certain situations in which the brew cycle will not begin when the BREW switch is pressed:

 

a)   BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option.

 

b)   FUNNEL NOT IN PLACE (or using a standard brew funnel) - cancel FUNNEL DETECT option.

 c) 

CHECK FUNNEL - remove funnel, empty previously brewed grounds and grind a new batch into the funnel. 

 

7.  If none of the above messages are displayed, the display will read NOW BREWING and the time remaining 

in the brew cycle.  

8.  Following the BREW will be a countdown of drip time DRIPPING which shows the time remaining until the 

funnel lock will release. Discard the grounds and filter only after visible dripping stops.

SET READY: XXX°

 (-)  DONE  (+)

37994.1 031512

Summary of Contents for SINGLE GPR DBC-DV

Page 1: ... the latest revision of the manual or to obtain the illustrated parts catalog please visit the Bunn O Matic website at www bunn com This is absolutely FREE and the quickest way to obtain the latest catalog and manual updates Contact Bunn O Matic Corporation at 1 800 286 6070 to obtain a paper copy of the required Illustrated Parts Catalog mailed via U S Postal Service 37994 0001B 08 13 2012 Bunn O...

Page 2: ...r authorization from BUNN that the defective equipment is under warranty THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY WRITTEN OR ORAL EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PAR TICULAR PURPOSE The agents dealers or employees of BUNN are not authorized to make modifications to this warranty or to ma...

Page 3: ...of the Food and Drug Administration FDA this equipment must be installed with adequate backflow prevention to comply with federal state and local codes For models installed outside the U S A you must comply with the applicable Plumb ing Sanitation Code for your area 03408 0004 03409 0004 12364 0000 Optional Field Wiring 120 208 240 V 16 8 19 5 A 3430 4540 W 1PH 3 Wire GND 60HZ 29710 0012A 29710 00...

Page 4: ...Cord must be at least 3 feet long and maximum 6 feet long measured from Strain Relief to end of the Attachment Plug Cap 9 Connect the brewer to the power source and verify the voltage at the terminal block 10 Set toggle switch on component bracket to the appropriate position and replace the access panel 11 If plumbing is to be hooked up later be sure the brewer is disconnected from the power sourc...

Page 5: ...ater line will facilitate moving the brewer to clean the counter top Bunn O Matic does not recommend the use of a saddle valve to install the brewer The size and shape of the hole made in the supply line by this type of device may restrict water flow AsdirectedintheInternationalPlumbingCodeoftheInternationalCodeCouncilandtheFoodCodeManual of the Food and Drug Administration FDA this equipment must...

Page 6: ...rogram ming of the brewer will exit the setup and return to the main screen d BREW SWITCH Momentarily pressing and releasing this switch begins a brew cycle e PROGRAM SWITCH Pressing and holding the upper right hidden switch allows entry to the programming menus Pressing and releasing the switch steps through each function screen during programming f FUNCTION SCREEN This is the display which shows...

Page 7: ...ssel beneath the faucet and open the faucet handle Release it when you hear the tank refilling 6 Water volumes have been preset at the factory Refer to adjustments for the Set Brew Volumes section of the Programming Manual on the Bunn O Matic website at www bunn com should the volume need to be increased or decreased 7 The brewer is now ready for use in accordance with the coffee brewing instructi...

Page 8: ...atch size on the grinder It is not necessary to select a size on the brewer 2 Insert a BUNN filter into the funnel 3 Grind or pour the proper amount of fresh ground coffee into the filter and level the grounds by gently shaking 4 Slide the funnel into the funnel rails If the grounds are not obtained through a grinder compatible with a Smart Funnel a batch size must be chosen on the brewer 5 Place ...

Page 9: ...its from the sprayhead holes 3 Insert the long end of sprayhead cleaning tool into the sprayhead fitting and rotate several times to remove any mineral deposits from the fitting 4 Insert the short end of sprayhead cleaning tool into the bypass fitting and rotate several times to remove any mineral deposits from the fitting NOTE In hard water areas this may need to be done daily It will help preven...

Reviews: