26
BATH FILL
LEVEL 3 ACCESS (Continued)
52959 082216
INITIAL FILL
Fill Tube
Fill Tube Connection
3. Pull the fill tube from the dispenser, remove the plug and connect it to the right most dispense valve.
4. Connect the dispenser to the power source.
5. Turn ON the Refrigeration Switch located next to the main circuit board. This will start the water bath pump
circulation.
6. Monitor the water bath fill level until water starts to trickle from the overflow tube. Touch "STOP" to stop the
fill process.
7. Check water level in the overflow tube and top off the tank if necessary (Step 5).
8. Disconnect the fill tube and allow excess water to drain into the drip tray. Replace the plug in the end of the
fill tube and store back into the dispenser.
NOTE: It will take several hours to create the ice bank required for full dispenser performance. During this time,
some further trickling from the water bath is expected due to expansion caused by ice bank formation. While
the refrigeration system is creating the ice bank, the dispenser may be readied for use as described in Loading,
Priming and Adjustment.
OPENS TO TEMPERATURE TEST - BATH FILL
CAUTION: The dispenser must be disconnected from the power source throughout the initial fill except when
specified in the instructions.
1. Remove drip tray assembly and splash panel from the dispenser. Replace the drip tray.
2. Connect the water source to the back of the dispenser.