Bunn Infusion Series Quick Start Manual Download Page 3

3

McDonald’s

®

 

 ICB SH

 

Quick Start Guide

Bunn-O-Matic Corporation

www.bunn.com

7.  Connect brewer to water 

source with supplied 
water line.

 

NOTE

:

 Located on lower, 

back, right of unit.

TIP

:

 Use a two person 

lift, and a cart, to move 
machine to installation 
location.

1.  Remove ICB SH brewer 

from box and packaging.

NOTE

:

 Pull box up.

3. Remove 

Brew Basket 

from 

Parts box.

4.  Locate all manuals  

and literature. 

 
Save in manager's office 
for future reference.

5.  The brewer is 32.8” tall x 

23.4” deep by 11.8” wide.

6.  Connect brewer to 

power source (120/208, 
3300W, 16 Amps).

NOTE

:

 Allow at least  

4” behind the brewer for 
power cord clearance 
and air flow.

10.  Allow brewer to reach 

brew temperature.

 

Approximately 15 
minutes.

11.  Remove 1.5 Gallon SH 

Server from box.

 

(PN 27850.0214)

9.  Allow brewer to fill 

with water.

 

Approximately 10 
minutes.

INITIAL SETUP

 - ICB SH Brewer

8.  Push power switch up to 

ON position.

 

NOTE

:

 Located on lower, 

back, left of unit.

2. Remove 

Parts box.

 

Remove all packaging 
materials including blue 
tape and cardboard from 
equipment vent located 
on back of machine.

 

Remove tape from USB 
and legs.

Summary of Contents for Infusion Series

Page 1: ... READ THIS FIRST Bunn O Matic Corporation 5020 Ash Grove Drive Springfield Illinois 62711 Phone 217 529 6601 Fax 217 529 6644 www bunn com For Technical Service contact Bunn O Matic Corporation at 1 800 286 6070 Soft Heat Server 1 5 Gallons 5 7L Freshness Indicator Lights GREEN Ready to serve YELLOW 10 minutes to expire RED Expired Empty Sight Gauge with Visual Markings 5 gal Hot Water Faucet Ergo...

Page 2: ...e Black Hose Clamp at the end of the drain hose 13 Reattach hose Fasten the Black Hose Clamp at the end of the drain hose 10 Detach hose Place the end of the drain hose in a container that has a minimum capacity of 200 oz 5 9 L 11 Open the White Clamp to drain water from tank 12 When tank is empty close the White Clamp and replace the plug 14 Replace the front panel and tighten screws 2 Flip the O...

Page 3: ...ce 5 The brewer is 32 8 tall x 23 4 deep by 11 8 wide 6 Connect brewer to power source 120 208 3300W 16 Amps NOTE Allow at least 4 behind the brewer for power cord clearance and air flow 10 Allow brewer to reach brew temperature Approximately 15 minutes 11 Remove 1 5 Gallon SH Server from box PN 27850 0214 9 Allow brewer to fill with water Approximately 10 minutes INITIAL SETUP ICB SH Brewer 8 Pus...

Page 4: ...sket 20 Remove Brew Basket and discard Kay Filter Pouch Cleaner Rinse Brew Basket thoroughly INITIAL SETUP continued 13 Remove the 2SH Remote Docking Stand from box NOTE Holds 2 SH Servers PN 27875 0200 16 Place Brew Basket and Server on brewer 17 Press Enable Brew button 14 Plug 1SH or 2SH stands into 120V power source 12 Remove the 1SH Remote Docking Stand from box NOTE Holds 1 SH Server PN 2782...

Page 5: ...e Regular Decaf or Special button NOTE Batch Size buttons are used to select amount of coffee to be brewed and to Start the brewing process 7 Press the switch of the desired Batch Size 8 When coffee stops dripping from Brew Basket tip carefully remove the Brew Basket to discard the used grounds 9 Dispense coffee from the Server while on the brewer 10 Move and dispense coffee from the Server while ...

Reviews: