background image

Page 14

ON

OF

F

ST

AR

T

SERVICE (cont.)

CONTROL THERMOSTAT

Location:

The control thermostat is located inside the hood

on the right side.

Test Procedures:
1. Disconnect the brewer from the power source.
2. With  a  voltmeter,  check  the  voltage  across  the

blue/black wire on the control thermostat  and the
white wire  on  the power cord for 120 volt model
15 or the white insert on the terminal block for two
wire 120 volt model 20, three wire 120/208 or 120/
240 volt models and the red insert on two wire 200
volt or 240 volt terminal block. Connect the brewer
to the power source. The indication must be:
a) 120 volts ac for two wire 120 volt models,  three
wire 120/208 or 120/240 volt models.
b) 200  to 240 volts ac for two wire 200 or 240 volt
models.

3. Disconned the brewer from the power source.

If voltage is present as described, proceed to #4.
If  voltage  is  not  present  as  described,  refer  to  the

Wiring Diagrams 

and check the wiring harness.

4. Gently  remove  the  capillary  bulb  and  grommet

from the tank.

5. With  a  voltmeter,  check  the  voltage  across  the

black wire of the control thermostat and the white
wire on the power cord for 120 volt two wire model
15, the white insert for two wire 120 volt model 20,
three wire 120/208 or 120/240 volt terminal block
and the red insert on the two pole 200 volt or 240
volt terminal block when the control thermostat is
turned "ON" (Fully clockwise). Connect the brewer

P2267

P1171

27479 091596

to the power source. The indication must be:
a) 120 volts ac for two wire 120 volt models,  three
wire 120/208 and 120/240 volt models.
b) 200 to 240 volts ac for two wire 200 volt or 240
volt models.

6. Disconnect the brewer from the power source.

If voltage is present as described, reinstall the capillary
tube into the tank to the line 4.5" above the bulb, the
control thermostat is operating properly.
If  voltage  is  not  present  as  described,  replace  the
thermostat.

Removal and Replacement:
1. Remove wires from control thermostat.
2. Remove  the  thermostat  capillary  bulb  by  firmly

pulling up on the capillary at the tank lid. This will
disengage the grommet from the tank lid.

3. Remove the one #6-32 screw securing the control

thermostat to the mounting bracket in the hood.

4. Slide the grommet to the line 4.5" above the bulb

on the new capillary tube.

5. Insert the capillary bulb through the hole in the

tank lid and press the grommet firmly and evenly
so that the groove in the grommet fits into the tank
lid.

6. Carefully bend the capillary tube so that the tube

and bulb inside the tank are in the vertical position.

NOTE -

 The capillary tube must be clear of any electri-

cal termination and not kinked.
7. Using one #6-32 screw secure the control thermo-

stat to the mounting bracket inside the hood.

8. Refer to Fig. 3 when reconnecting the wires.
9. Adjust the control thermostat as required.

FIG. 1 CONTROL THERMOSTAT

FIG. 3 CONTROL THERMOSTAT TERMINALS

BLK  Lead  from
Thermal Fuse

BLU/BLK  Lead  from
Limit Thermostat

All manuals and user guides at all-guides.com

Summary of Contents for GMB-PS

Page 1: ...E D BO ILED DR Y HE AT ED WHE N EM PT Y US ED ON HIGH FL AM E OR EX PO SE D EL EC TR IC EL EM EN TS FA ILURE TO COMPL Y RISKS INJU RY PN 658 198 5 BU NN O MA TIC CO RP OR AT ION FU NNEL CONTE NTS ARE...

Page 2: ...Y OR FITNESS FOR A PARTICULAR PURPOSE The agents dealers or employees of Bunn are not authorized to make modifications to this warranty or to make additional warranties that are binding on Bunn Accord...

Page 3: ...ED ON HIGH FLAME OR EXPOSED ELECTRIC ELEMENTS READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT FAILURE TO COMPLY RISKS INJURY PN 00658 0000F 6 98 1985 BUNN O MATIC CORPORATION 00831 0000F 3...

Page 4: ...REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi 138 and620kPa froma1 2 orlargersupplyline Ashut offvalveshouldbeinstalledinthelinebefore...

Page 5: ...opped flowing from the funnel and let the water in the tank reheat to the proper temperature 7 Placethe ON OFF switchinthe ON upperposition andmomentarilypressandreleasethestartswitch Check the water...

Page 6: ...ng to be done until switch is once again placed in the SET position OPERATING CONTROLS ON OFF SWITCH Placing the ON OFF switch in the OFF lower position stops brewing Stopping a brew cycle after it ha...

Page 7: ...edorloosened Thiswillhelp to avoid twists and kinks in the tubing Make certain that all plumbing connections are sealed and electrical connections tight and isolated This brewer is heated at all times...

Page 8: ...ions Clear or replace A Direction of flow arrow must be pointing towards brewer B Removestrainerandcheckfor obstructions Clear or replace Refer to Service Limit Thermo stat for testing procedures See...

Page 9: ...row must be pointing towards the brewer B Remove the flow control and check for obstructions Clear or replace A Direction of flow arrow must be pointing towards the brewer B Removethestrainerandcheck...

Page 10: ...er condi tions Excessive mineral build up on stainless steel surfaces can ini tiate corrosive reactions resulting in serious leaks 3 Solenoid Valve 1 Timer REMEDY A Direction of flow arrow must be poi...

Page 11: ...and clear any obstructions Rebuild or replace the valve if necessary See page 17 BUNN paperfiltersmustbeused for proper extraction A fine or drip grind must be used for proper extraction Aseven holest...

Page 12: ...ofgroundsleveledbygentlyshak ing The nut on the solenoid must be tight or it will vibrate during op eration Plumbing lines should not resting on the counter top A Thebrewermustbeconnected to a cold wa...

Page 13: ...Inspection testing and repair of electri cal equipment should be performed only by qualified service personnel The brewer should be unplugged when servicing except when electrical tests are re quired...

Page 14: ...2267 P1171 27479 091596 to the power source The indication must be a 120 volts ac for two wire 120 volt models three wire 120 208 and 120 240 volt models b 200 to 240 volts ac for two wire 200 volt or...

Page 15: ...s operating properly If continuity is not present as described replace the limit thermostat P2267 P1800 BLU BLK Lead to Control Thermo stat BLK to Power Cord or Terminal Block Black Insert 27479 12150...

Page 16: ...rewer wiring har ness 5 With the black wire removed remove the white red wire from the lower terminal 6 Check for continuity across the center and lower terminal with the switch in the ON position Con...

Page 17: ...noid valve for a clicking sound as the coil magnet attracts 7 Disconnect the brewer from the power source If the sound is heard as described and water will not pass through the solenoid valve there ma...

Page 18: ...he white orange wire to the top terminal and the white yellow wire to the bottom terminal If continuity is not present as described replace the switch ON OF F ST AR T N operating pressure Control 2422...

Page 19: ...P1176 27479 121500 FIG 13 TANK HEATER TERMINALS Removal and Replacement 1 Shut off water supply to the brewer 2 Disconnect the water supply tubes on the tank lid for the tank and the faucet coil asse...

Page 20: ...d proceed to 7 If voltage is not present as described refer to Wiring Diagrams and check the brewer wiring harness MI NU TE S BU NN O M AT IC P N 26 20 12 0 VA C ON OF F ST AR T P1170 P1177 27479 1215...

Page 21: ...r source and replace the timer 7 With a voltmeter check the voltage across termi nals TL1 and TL4 when the ON OFF switch is in the ON position Connectthebrewertothepower source and press the START swi...

Page 22: ...d Place the ON OFF switch in the ON position press and hold the START switch until three distinct clicks are heard and then release the switch Failure to release the switch within two seconds after th...

Page 23: ...Page 23 27479 091596 All manuals and user guides at all guides com...

Page 24: ...Page 24 27479 091596 All manuals and user guides at all guides com...

Reviews: