background image

8

NUMBER NAME 

NUMBER 

NAME

 

Regular 

15 

Jamaica Blue Mtn

 2 

Decaf 

16 

Guatemalan

 

Colombian 

17 

Light Roast

 

Colombia Supremo 

18 

Dark Roast

 

Costa Rican 

19 

Espresso

 6 

Ethiopian 

20 

Amaretto

 7 

Kona 

21 

Hazelnut

 

Kenya AA 

22 

French Vanilla

 

Sumatran 

23 

Irish Creme

 

10 

French Roast 

24 

Vanilla Nut

 

11 

Italian Roast 

25 

Caramel

 

12 

Mocha Java 

26 

Raspberry

 

13 

House Blend 

27 

Almond

 

14 

Breakfast Blend 

28 

Dark Mtn Roast

COFFEE CHART

Entering a coffee name using a RECIPE CARD.

1.  Press the STOP button and place the chip portion of the card under the sensor coil on the front of the 

grinder.

2.  After a short pause, the display will show 3 “dashes”.

3.  Remove the card and press any batch switch on the side to be programmed.

4.  The display should show the number of the coffee name loaded into the grinder.

5.  The grinder display will then return to the normal operating mode.

NOTE: If a number is chosen from the chart below, and entered into the grinder, check to be sure the number 

entered represents the name of the coffee on the chart.

1.  Grind into the funnel then insert the funnel into the brewer funnel rails.

2.  The display will read the coffee name that was ground into the funnel.

3.  If this name is different from the name on the chart, the grinder’s memory needs to be reset.

Resetting the grinder memory (to match the chart below)

1.  Unplug grinder from the outlet.

2.  Press in and hold both the STOP and the GRIND buttons and plug cordset into the outlet. After a short pause, 

the display will show a series of 3 dashes followed by a series of 9 dashes.

3.  When the 9 dashes appear, release the STOP and GRIND buttons, then press and release the STOP button.

4.  The display will count down then return to the normal operating mode. The grinder should now be set to 

match the coffee names with the numbers on the chart below.

33736  072310

SELECTING COFFEE NAMES (Continued)

Summary of Contents for G9-2T DB

Page 1: ...3227 PHONE 217 529 6601 FAX 217 529 6644 To ensure you have the latest revision of the Operating Manual or to view the Illustrated Parts Catalog Programming Manual or Service Manual please visit the...

Page 2: ...s to this warranty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied up...

Page 3: ...R SHOCK HAZARD Use only on a properly protected circuit capable of the rated load Electrically ground the chassis Follow national local electrical codes Do not use near combustibles WARNING 20545 0000...

Page 4: ...ere the temperature is between 5 C to 35 C Appliance shall not be tilted more than 10 for safe operation An electrician must provide electrical service as specified in conformance with all local and n...

Page 5: ...are located on the funnel depictions on each side of the grinder with a total of 6 pads Selecting one of these pads will select the amount of grind and side from which to grind Example Selecting the l...

Page 6: ...r plate rotor cup and front cover to the burr housing 8 Reinstall the upper front inspection panel 9 Refer to the Adjustment section of the Operating and Service manual for burr adjustments COFFEE GRI...

Page 7: ...s in a counterclockwise direction 33736 072310 COMMUNICATING WITH COFFEE BREWER When the grinder is used with its companion brewer the name of the coffee and the size of the batch ground is communicat...

Page 8: ...eturn to the normal operating mode NOTE If a number is chosen from the chart below and entered into the grinder check to be sure the number entered represents the name of the coffee on the chart 1 Gri...

Page 9: ...Use the table below to find approximate timer setting for the grind and amount of coffee desired 3 To enter the setup mode and make an adjustment press and hold the hidden programming pad under the On...

Reviews: