Bunn-O-Matic Corporation
5
Step 3:
Attach the wire ends to the terminal block.
Step 4:
Attach the ground wire to connector on the frame cross bar.
Step 5:
Check that all connections are tight.
Step 6:
Tighten the strain relief and replace the front panel.
Step 7:
Plug the unit into the power source.
Initial Start-Up
Note:
If the brewer has a serial number prior to DUAL0680000 the machine does not have
an On/Off switch and will turn on when the unit is plugged in.
Step 1:
Flip the On/Off switch to the On position.
When the machine is turned on, it will begin to
fi
ll the tank. After the tank
fi
lls the machine
will automatically begin the heating cycle. This will take approximately 20 minutes.
Once the water temperature has reached the programmed Brew Lockout temperature it will
display the ready screen. The machine will continue to heat until it reaches its programmed
shut-off temperature.
PLEASE WAIT
TANK FILLING
HEATING
READY TO BREW
WATER TEMP ###°
WATER TEMP 200°
Summary of Contents for Dual SH BrewWISE
Page 1: ...BUNN TECHNICAL TRAINING Dual SH BrewWISE DBC ...
Page 26: ......