yellow
blue
6-39
Passenger’s Side Headlamp Shown
B. Horizontal aim adjustment screw
C. Horizontal block index plate
D. Vertical aiming level
Start with the horizontal aim. The adjustment screws can
be turned with an E8 Torx
R
socket.
Once the horizontal aim is adjusted, then adjust the
vertical aim.
1. Turn the horizontal aiming screw until the indicator
is lined up with zero.
2. Turn the vertical aiming screw until the level bubble
is lined up with zero.
Front Parking and Turn Signal Lamp
1. Remove the headlamp assembly. Refer to the
removal procedure earlier in this section.
2. Remove the rubber bulb access cover.
3. Twist and pull the sidemarker lamp socket
counterclockwise from the headlamp assembly.
4. Holding the base of the bulb, pull the bulb from
the socket.
5. Push the new bulb into the socket.
6. Put the socket back into the headlamp assembly and
turn it clockwise until it is secure.
7. Replace the rubber bulb access cover.
8. Replace the headlamp assembly.
Summary of Contents for 1999 Regal
Page 6: ...yellowblue vi NOTES...
Page 60: ...yellowblue 1 54 NOTES...
Page 118: ...yellowblue 2 58 Optional Cluster United States Version Shown Canadian Similar...
Page 138: ...yellowblue 2 78 NOTES...
Page 164: ...yellowblue 3 26 NOTES...
Page 204: ...yellowblue 4 40 NOTES...
Page 238: ...yellowblue 5 34 NOTES...
Page 239: ...yellowblue 5 35 NOTES...
Page 240: ...yellowblue 5 36 NOTES...
Page 314: ...yellowblue 6 74 NOTES...
Page 338: ...yellowblue 7 24 Maintenance Record DATE ODOMETER READING SERVICED BY MAINTENANCE PERFORMED...
Page 339: ...yellowblue 7 25 Maintenance Record DATE ODOMETER READING SERVICED BY MAINTENANCE PERFORMED...
Page 340: ...yellowblue 7 26 Maintenance Record DATE ODOMETER READING SERVICED BY MAINTENANCE PERFORMED...
Page 341: ...yellowblue 7 27 Maintenance Record DATE ODOMETER READING SERVICED BY MAINTENANCE PERFORMED...
Page 342: ...yellowblue 7 28 Maintenance Record DATE ODOMETER READING SERVICED BY MAINTENANCE PERFORMED...
Page 343: ...yellowblue 7 29 Maintenance Record DATE ODOMETER READING SERVICED BY MAINTENANCE PERFORMED...
Page 344: ...yellowblue 7 30 Maintenance Record DATE ODOMETER READING SERVICED BY MAINTENANCE PERFORMED...