Boiler Assembly
6
17
We reserve the right to make any changes due to technical modifications!
Boiler Installation and Maintenance Manual SB735 • Issue 10/2003
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
z
Install the well provided with the Logamatic control
into the
M
tapping.
z
Route the capillary tubes with sensor to the sensor
well (Fig. 19).
z
Insert the sensor into the sensor well, until it bottoms
out (sensor well
M
, see page 6 in Fig. 1) (Fig. 19).
z
During the insertion, the plastic spiral (Fig. 20,
Item.
2) holding the sensor together slides back
automatically. To ensure a perfect contact between
the sensor well (Fig. 20,
Item.
3) and the sensor
surfaces - thereby guaranteeing the safe
temperature transfer - push the compensating spring
(Fig. 20,
Item.
1).
z
Push the sensor holder (Fig. 20,
Item.
4) from the
side or from above over the sensor well head.
Fig. 19
Sensor to the sensor well
Fig. 20
Capillary tubes with sensor and sensor well
Item. 1:
Compensating spring
Item. 2:
Plastic spiral
Item. 3:
Sensor well
Item. 4:
Sensor holder
M
1
2
3
4