Actions
7
We reserve the right to make technical modifications
Buderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
67
box 237
z
Use the adjustment screw to readjust the gas/air ratio if
necessary (item 1).
I
NOTE:
The adjustment screw (4mm Allen screw) is located
behind the screw-on cover.
box 238
z
Take the boiler out of operation and close the gas tap,
z
Remove the pressure gauge.
z
Tighten the screw on the burner pressure measurement
nipple.
z
Open the gas cock and place the boiler into full-load
operation, see box 59, 54, 55 and 13.
z
Wait for the boiler to start.
z
Use a detection product to check the burner pressure
measurement nipple for leaks. Use an authorised foam-
type leak detection product for this purpose.
z
Take the boiler out of operation, see box 43 or 44.
z
Fit the casing and place the boiler into operation,
box 239 Vent the gas flow pipe.
A
DANGER OF FATAL ACCIDENT!
All work on gas supply pipes and gas-fitting
components must be carried out by a company
registered and authorised for this purpose.
z
Take the boiler out of operation and close the gas tap,
1
box 240
z
Loosen by two turns the screw on the gas connection
pressure measuring nipple (item 1).
z
Connect a long hose (item 2) to the gas connection
pressure measurement nipple and then run this hose out
of the building.
box 241
z
Leave the gas cock open until no further air escapes from
the hose, see box 59.
z
Close the gas cock, see box 46.
z
Remove the hose from the gas connection pressure
measurement nipple.
z
Tighten the screw on the gas connection pressure
measurement nipple.
z
Open the gas tap, see box 59.
z
Use a detection product to check the gas connection
pressure measurement nipple for leaks. Use an
authorised foam-type leak detection product for this
purpose.
z
Fit the casing and place the boiler into operation,
box 242 Replace the automatic air vent
z
Take the boiler out of operation and drain the heating
system, see box 48 to 50.
2
1