6 Operation
20
F-100 / F-105
Operation Manual, Version C
Rear side
1
8
2
7
5
6
3
4
1
Cooling medium flow in
2
Cooling medium flow out
3
Power socket
4
Communication cable socket, RS485
(not available for F-100 models)
5
Fuse
6
Slots for air flow out
7
Antistatic wheels (not lockable)
8
Drainvalve, to empty the cooling medium tank
6 .2
Preparing for use
Prerequisites
• All parts must be clean and free of damage.
• Close the drainvalve.
6 .2 .1
Installing the hoses
!
WARNING
Stumbling or falling due to improper installation of the cables and hoses.
• The length of the cables and hoses should be kept as short as possible
• If possible, avoid installing cables and hoses in aisle areas
• If installation of cables and hoses in aisle areas is unavoidable, use an adequate protective
pad in order to avoid the danger of stumbling and damage
• Connect out flow and return flow connections of the Recirculating Chiller with the condenser of the
rotary evaporator.
NOTE
Only use hoses which can withstand min. –10 °C and 2 bar pressure and secure them with the usual
hose clamps.
• Connect Chiller outlet (OUT) to the second condenser installed on the pump.
• Connect the outlet of the second condenser to the Rotavapor
®
Condenser.
• Connect the outlet of the Rotavapor
®
Condenser to the inlet (IN) of the Recirculating Chiller.
Summary of Contents for F-100
Page 1: ...Recirculating Chiller F 100 F 105 Operation Manual 11593840C en ...
Page 32: ......
Page 33: ......