5 Putting into operation
19
B-390
Operation Manual, Version E
5
Putting into operation
This chapter describes how the instrument has to be installed. It also gives instructions for the initial
startup.
NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report imme-
diately to inform the postal company, railway company or transportation company. Keep the original
packaging for future transportation.
5 .1
Installation site
Put the instrument on a stable, horizontal surface. Consider the maximum product dimensions and
weight. The instrument must be set up in such a way that the main switch and the mains plug are
easily accessible at all times.
Obtain the environmental conditions as described in
section 3.2 “Technical data”
.
!
Warning
Death or serious injuries by use in explosive environments.
• Do not operate the instrument in explosive environments.
!
Warning
Death or serious poisoning by contact or incorporation of harmful substances.
• Wear safety goggles.
• Wear safety gloves.
• Wear a laboratory coat.
• Clean the instrument and all accessories thoroughly to remove possibly dangerous
substances.
• Do not clean dusty parts with compressed air.
• Store the instrument and its accessories at a dry place.