Installation
※ When install the tube feeding training model,
be sure to lock the valve of draining tube before injecting water.
50
60
40
30
20
10
Put the manikin in a supine position,
lock the valve of the draining tube and insert it into the draining connector of manikin.
Insert the injector for endotracheal suction to the connector
and open the valve of water inlet on the abdomen.
Open the water inlet valve, insert the funnel and fill it with 300cc ~ 350cc of water.
50
60
40
30
20
10
Summary of Contents for BT-CSIS
Page 1: ...Tube Feeding Training Model USER S GUIDE BT CSIS ...
Page 2: ......