6
DPR-901ii
Installation
Unpacking
Mechanical Installation
As part of BSS AUDIO’s system of quality control, this product is
carefully checked before packing, to ensure flawless appearance.
After unpacking the unit, please inspect for any physical damage and
retain the shipping carton and all relevant packing materials for use
should the unit need returning.
A packet of spare fuses is supplied. Please keep them in a safe place.
If any damage has occurred, please notify your dealer immediately, so
that a written claim for damages can be initiated. See the Warranty
section of this manual.
A vertical rack space of 1U (1.75", 44.5mm) is required. Figure 2.1
details the relevant dimensions and fixing centres.
If the unit is part of a transportable system, you must support the unit at
it’s rear by additional bracing or shelving . Failure to do so will impair
reliability and invalidate the Warranty. Additional threaded M3 screw
holes are provided on the rear sides to assist in providing proper
support.
Adequate ventilation must be provided for by allowing sufficient room
around the sides and rear of the unit to allow free circulation of air.
Forced cooling is not required.
2.0
Installation
2.1 Unpacking
Fig. 2.1 Mechanical
Dimensions
2.2 Mechanical
Installation
Summary of Contents for DPR-901ii
Page 19: ...19 Using the DPR 901ii 5 1 DPR 901ii Block Diagram ...
Page 28: ...2 8 DPR 901ii User Notes ...
Page 29: ...29 User Notes ...
Page 30: ...3 0 DPR 901ii ...