background image

CRYSTAL CLEAN AIR

TM

GENERAL INSTALLATION GUIDELINES

10 

BSE, Inc., 2246 Palmer Drive, Suite 108, Schaumburg, IL 60173 

T:  866-360-5675 email: [email protected] web: www.bsesales.com 

Installation BA-800/BA-1000 

WARNING

• 

• 
• 

Installation Instruction

 

1.

Place the unit on the wall and mark the location of the four (4) holes.

2.

Drill four (4) holes and drive the four (4) plastic anchors into each of the drilled holes.

3.

Hold the unit in place as you drill the screws into the top left and right of the unit.

4.

After the top of the unit is secure, attach the bottom with the remaining two (2) screws. Tighten all screws.

5.

After the unit is anchored, test the installation by gently applying downward pressure with both hands and jiggling to
be sure it is attached securely.

6.

If the unit is loose, repeat the steps above and adjust the screws, as necessary. If the unit is secure, the installation is
complete.

7.

Plug in the cord into a power outlet and enjoy cleaner air!

Summary of Contents for Crystal Clean Air BA-1000

Page 1: ...e Suite 108 Schaumburg IL 60173 T 866 360 5675 email bsesales com web www bsesales com Ionization Unit Installation Manual Crystal Clean Air Ionization Unit BA 800 BA 1000 Crystal Clean Air BA 350 Cus...

Page 2: ...l bsesales com web www bsesales com PROPRIETARY DATA NOTICE This document as well as all reports illustrations data information and other materials are the property of BSE Inc Please read carefully an...

Page 3: ...ING CAUTION Installation DANGER Do not use or store flammable gas or combustibles near the unit There is risk of product failure fire explosion and physical injury or death WARNING Do not install remo...

Page 4: ...dedicated power source that provides adequate power Refer to local state and federal codes and use power wires of sufficient current capacity and rating Secure all field wiring connections with appro...

Page 5: ...Installation guide One 1 Each Variable Speed Controller Wireless Remote Note Hardware Not Supplied Crystal Clean Air BA 350 Installation guide One 1 Each Mounting plate One 1 Each Note Hardware Not S...

Page 6: ...6 360 5675 email bse bsesales com web www bsesales com Crystal Clean Air Accessories Crystal Clean Air BA 1000 External Dimensions inches Figure 5 Dimensions Crystal Clean Air BA 1000 External Dimensi...

Page 7: ...Clearances for Max Figure 8 Installing Max Wall Mounted Required Clearances for Max Figure 9 Installing Max Ceiling Mounted Required Clearances for Max Wall Mounted Unit See the figure on the right fo...

Page 8: ...ment to the Indoor Air Quality IAQ and occupant comfort Figure 8 Installing BA 350 Required Clearances for Mini Figure 9 Installing BA 350 Required Clearances for BA 350 See the figure on the left for...

Page 9: ...with filing a freight claim and to order a replacement unit 1 Before opening the shipping container verify you have the correct unit 2 Place the box on a solid surface right side up 3 Open the top of...

Page 10: ...each of the drilled holes 3 Hold the unit in place as you drill the screws into the top left and right of the unit 4 After the top of the unit is secure attach the bottom with the remaining two 2 scre...

Page 11: ...2 Place the mounting plate and mark the location of the four 4 holes To Ensure the unit is level use a leveling tool If mounting the unit on concrete consider using anchor bolts 3 Drill four 4 holes a...

Page 12: ...360 5675 email sales bsesales com web www bsesales com GENERAL MANITENANCE GUIDELINES Maintenance Virtually maintenance free suggested maintenance includes spraying ionizer tips with canned air 1x ye...

Reviews:

Related manuals for Crystal Clean Air BA-1000